h1. 2015-04-16-Review
2
3
h2. Agendas and supporting material for:
4
* Resource Loaded Schedule Review 5
5 2 Long, Kenneth
* MICE Project Board 9 
6 1 Long, Kenneth
* FAC
7
8 4 Long, Kenneth
h2. Documentation
9
10
* RLSR:
11
** "Resource loaded schedule, costs and risks for the completion of the MICE project":
12
*** Present draft (17Mar15): PDF, tar ball
13
14
* MPB:
15
** "Status report":
16
*** Present draft (17Mar15): PDF, tar ball
17
18
h2. RLSR, MPB & FAC outline agendas – 16 & 17 April 2015
19 1 Long, Kenneth
*Venue*
20
21 4 Long, Kenneth
h3. Thursday, 16 April 2015
22 1 Long, Kenneth
23 4 Long, Kenneth
h3. RLSR & MPB-9 outline agendas
24 1 Long, Kenneth
25
|*_16 April 2015_* |
26 3 Long, Kenneth
|*09:00-09:45*     | *RLSR closed session – introduction*     |
27 1 Long, Kenneth
|                  | Project overview                         | K. Long   | ??' + ??' |
28 3 Long, Kenneth
|*??:??-??:??*     | *RLSR presentations & questions*         |
29 1 Long, Kenneth
|                  | Schedule to completion and project risks | R. Preece | ??' + ??' |
30
|                  | US project plan for MICE                 | M. Palmer | ??' + ??' |
31
|                  | UK financial plan, risks                 | A. Grant  | ??' + ??' |
32
|                  | Unscheduled                              | ???’ - ???’| = ??'     |
33 3 Long, Kenneth
| *12:45-13:15*    | *Lunch*                                  |
34
| *13:15-??:??*    | *RLSR closed session – critical findings*|
35
| *??:??-??:??*    | *Step IV, commissioning, operations and control*              |
36 1 Long, Kenneth
|                  | Step IV commissioning and operations planning; overview       | S. Boyd      | ??' + ??' |
37
|                  | MICE Muon Beam and MICE channel optics and commissioning plan | J. Pasternak | ??' + ??' |
38
|                  | Step IV measurements and analysis planning                    | C. Rogers    | ??' + ??' |
39 3 Long, Kenneth
|                  | Controls and monitoring                                       | P. Hanlet    | ??' + ??' |
40
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
41 2 Long, Kenneth
|*15:30-??:??*     | *Closed session, report writing*                              |
42 1 Long, Kenneth
|*16:00-??:??*     | Reconstruction, simulation and data flow                      |
43
|                  | Softawre, computing and data processing; overview             | D. Rajaram   | ??' + ??' |
44
|                  | Reconstruction; online, offline and batch                     | A. Dobbs     | ??' + ??' |
45
|                  | Simulation and configuration management                       | R. Bayes     | ??' + ??' |
46 3 Long, Kenneth
|                  | Data flow: from front-end boards to automatic batch processing| Y. Karadzhov | ??' + ??' |
47 1 Long, Kenneth
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
48
|*17:30-18:00*     | *Closed session, report writing*                              |
49 3 Long, Kenneth
|*18:00*           | *Adjourn*                                                     |
50 1 Long, Kenneth
     
51 4 Long, Kenneth
h3. Friday 17 April 2015
52 2 Long, Kenneth
53 4 Long, Kenneth
h4. MPB-9 outline agenda
54 3 Long, Kenneth
55
|*_17 April 2015_* |
56 2 Long, Kenneth
|*09:00-??:??*     | *Cooling-demonstration integration, SC magnets and RF*        |
57
|                  | Focus-coils, liquid-hydrogen system and absorbers             | S. Watson    | ??' + ??' |
58 1 Long, Kenneth
|                  | Cavity modules and test programme, PRY and spectrometer solenoids | A. Bross | ??' + ??' |
59
|                  | RF-power distribution                                         | K. Ronald    | ??' + ??' |
60
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
61 2 Long, Kenneth
|*10:30-??:??*     | *Closed session, report writing*                              |
62 1 Long, Kenneth
|*11:30-??:??*     | *Close-out with MICE managenent                               |
63
|*12:00-??:??*     | *Lunch*                                                       |
64
|*13:00*           | *Adjourn for report writing*                                  |
65
66 4 Long, Kenneth
h4. FAC outline agenda
67 2 Long, Kenneth
68 1 Long, Kenneth
* To be posted.
69
70 2 Long, Kenneth
h4. Backup presentations:
71
72 1 Long, Kenneth
* To be posted.
73
74 4 Long, Kenneth
h3. Supporting documents:
75
* To be posted
76 1 Long, Kenneth
77
[[governance:External|Back]]