2015-04-16-Review » History » Version 3

Long, Kenneth, 17 March 2015 09:06

1 1 Long, Kenneth
h1. 2015-04-16-Review
2
3
h2. Agendas and supporting material for:
4
* Resource Loaded Schedule Review 5
5 2 Long, Kenneth
* MICE Project Board 9 
6 1 Long, Kenneth
* FAC
7
8
h3. RLSR, MPB & FAC outline agendas – 16 & 17 April 2015
9
*Venue*
10
11
h4. Thursday, 16 April 2015
12
13 2 Long, Kenneth
h5. RLSR & MPB-9 outline agendas
14 1 Long, Kenneth
15
|*_16 April 2015_* |
16 3 Long, Kenneth
|*09:00-09:45*     | *RLSR closed session – introduction*     |
17 1 Long, Kenneth
|                  | Project overview                         | K. Long   | ??' + ??' |
18 3 Long, Kenneth
|*??:??-??:??*     | *RLSR presentations & questions*         |
19 1 Long, Kenneth
|                  | Schedule to completion and project risks | R. Preece | ??' + ??' |
20
|                  | US project plan for MICE                 | M. Palmer | ??' + ??' |
21
|                  | UK financial plan, risks                 | A. Grant  | ??' + ??' |
22
|                  | Unscheduled                              | ???’ - ???’| = ??'     |
23 3 Long, Kenneth
| *12:45-13:15*    | *Lunch*                                  |
24
| *13:15-??:??*    | *RLSR closed session – critical findings*|
25
| *??:??-??:??*    | *Step IV, commissioning, operations and control*              |
26 1 Long, Kenneth
|                  | Step IV commissioning and operations planning; overview       | S. Boyd      | ??' + ??' |
27
|                  | MICE Muon Beam and MICE channel optics and commissioning plan | J. Pasternak | ??' + ??' |
28
|                  | Step IV measurements and analysis planning                    | C. Rogers    | ??' + ??' |
29
|                  | Controls and monitoring                                       | P. Hanlet    | ??' + ??' |
30
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
31 3 Long, Kenneth
|*15:30-??:??*     | *Closed session, report writing*                              |
32
|*16:00-??:??*     | Reconstruction, simulation and data flow                      |
33 2 Long, Kenneth
|                  | Softawre, computing and data processing; overview             | D. Rajaram   | ??' + ??' |
34 1 Long, Kenneth
|                  | Reconstruction; online, offline and batch                     | A. Dobbs     | ??' + ??' |
35
|                  | Simulation and configuration management                       | R. Bayes     | ??' + ??' |
36
|                  | Data flow: from front-end boards to automatic batch processing| Y. Karadzhov | ??' + ??' |
37
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
38 3 Long, Kenneth
|*17:30-18:00*     | *Closed session, report writing*                              |
39
|*18:00*           | *Adjourn*                                                     |
40 1 Long, Kenneth
     
41 2 Long, Kenneth
h4. Friday 17 April 2015
42 1 Long, Kenneth
43 2 Long, Kenneth
h5. MPB-9 outline agenda
44 1 Long, Kenneth
45 3 Long, Kenneth
|*_17 April 2015_* |
46
|*09:00-??:??*     | *Cooling-demonstration integration, SC magnets and RF*        |
47 2 Long, Kenneth
|                  | Focus-coils, liquid-hydrogen system and absorbers             | S. Watson    | ??' + ??' |
48
|                  | Cavity modules and test programme, PRY and spectrometer solenoids | A. Bross | ??' + ??' |
49
|                  | RF-power distribution                                         | K. Ronald    | ??' + ??' |
50
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
51 3 Long, Kenneth
|*10:30-??:??*     | *Closed session, report writing*                              |
52
|*11:30-??:??*     | *Close-out with MICE managenent                               |
53
|*12:00-??:??*     | *Lunch*                                                       |
54
|*13:00*           | *Adjourn for report writing*                                  |
55 1 Long, Kenneth
56
h5. FAC outline agenda
57
58 2 Long, Kenneth
* To be posted.
59 1 Long, Kenneth
60
h4. Backup presentations:
61
62 2 Long, Kenneth
* To be posted.
63 1 Long, Kenneth
64
h2. Documentation
65
66
* RLSR:
67 2 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":
68
*** Present draft (17Mar15): PDF, tar ball
69 1 Long, Kenneth
70
* MPB:
71 2 Long, Kenneth
** "Status report":
72
*** Present draft (17Mar15): PDF, tar ball
73 1 Long, Kenneth
74
75 2 Long, Kenneth
* Supporting documents:
76
** To be posted
77 1 Long, Kenneth
78