2015-04-16-Review

Agendas and supporting material for:
  • Resource Loaded Schedule Review 5
  • MICE Project Board 9
  • FAC

RLSR, MPB & FAC outline agendas – 16 & 17 April 2015
Venue

Thursday, 16 April 2015

RLSR & MPB-9 outline agendas
16 April 2015
09:00-09:45 RLSR closed session – introduction
Project overview K. Long ??' + ??'
:??-:?? RLSR presentations & questions
Schedule to completion and project risks R. Preece ??' + ??'
US project plan for MICE M. Palmer ??' + ??'
UK financial plan, risks A. Grant ??' + ??'
Unscheduled ?’ - ? = ??'
12:45-13:15 Lunch
13:15-??:?? RLSR closed session – critical findings
:??-:?? Step IV, commissioning, operations and control
Step IV commissioning and operations planning; overview S. Boyd ??' + ??'
MICE Muon Beam and MICE channel optics and commissioning plan J. Pasternak ??' + ??'
Step IV measurements and analysis planning C. Rogers ??' + ??'
Controls and monitoring P. Hanlet ??' + ??'
Unscheduled ?’ - ? = ??'
15:30-??:?? Closed session, report writing
16:00-??:?? Reconstruction, simulation and data flow
Softawre, computing and data processing; overview D. Rajaram ??' + ??'
Reconstruction; online, offline and batch A. Dobbs ??' + ??'
Simulation and configuration management R. Bayes ??' + ??'
Data flow: from front-end boards to automatic batch processing Y. Karadzhov ??' + ??'
Unscheduled ?’ - ? = ??'
17:30-18:00 Closed session, report writing
18:00 Adjourn

Friday 17 April 2015

MPB-9 outline agenda
16 April 2015
09:00-??:?? Cooling-demonstration integration, SC magnets and RF
Focus-coils, liquid-hydrogen system and absorbers S. Watson ??' + ??'
Cavity modules and test programme, PRY and spectrometer solenoids A. Bross ??' + ??'
RF-power distribution K. Ronald ??' + ??'
Unscheduled ?’ - ? = ??'
10:30-??:?? Closed session, report writing
11:30-??:?? *Close-out with MICE managenent
12:00-??:?? Lunch
13:00 Adjourn for report writing
FAC outline agenda
  • To be posted.

Backup presentations:

  • To be posted.

Documentation

  • RLSR:
    • "Resource loaded schedule, costs and risks for the completion of the MICE project":
      • Present draft (17Mar15): PDF, tar ball
  • MPB:
    • "Status report":
      • Present draft (17Mar15): PDF, tar ball
  • Supporting documents:
    • To be posted