Project

General

Profile

2015-04-16-Review » History » Version 15

Long, Kenneth, 27 March 2015 22:09

1 5 Long, Kenneth
h1. MICE Project Board and Resource Loaded Schedule Review, April 2015
2 1 Long, Kenneth
3 4 Long, Kenneth
h2. Documentation
4
5
* RLSR:
6
** "Resource loaded schedule, costs and risks for the completion of the MICE project":
7 7 Long, Kenneth
*** Present draft (17Mar15): PDF: attachment:RLSR-report.pdf; ZIP: attachment:01-RLSR-project-summary.zip
8 4 Long, Kenneth
9
* MPB:
10
** "Status report":
11 8 Long, Kenneth
*** Present draft (17Mar15): PDF: attachment:MPB-report.pdf; ZIP: attachment:01-MPB-summary.zip
12 4 Long, Kenneth
13 13 Long, Kenneth
* Response to the feedback from the RLSR panel and the MPB after the April November 2014 review
14 15 Long, Kenneth
** document#122
15 13 Long, Kenneth
16 4 Long, Kenneth
h2. RLSR, MPB & FAC outline agendas – 16 & 17 April 2015
17 6 Long, Kenneth
18 1 Long, Kenneth
*Venue*
19
20 4 Long, Kenneth
h3. Thursday, 16 April 2015
21 1 Long, Kenneth
22 4 Long, Kenneth
h3. RLSR & MPB-9 outline agendas
23 1 Long, Kenneth
24 9 Long, Kenneth
|\4=. *_16 April 2015_* |
25
|*09:00-09:45*     |\3=. *RLSR closed session – introduction*     |
26 1 Long, Kenneth
|                  | Project overview                         | K. Long   | ??' + ??' |
27 12 Long, Kenneth
|*??:??-??:??*     |\3=. *RLSR presentations & questions*         |
28 9 Long, Kenneth
|                  | Schedule to completion, project risks and overview of critical interfaces | R. Preece | ??' + ??' |
29
|                  | Re-baselined deliverables, critical decision points and status of US deliverables | M. Palmer | ??' + ??' |
30 1 Long, Kenneth
|                  | UK financial plan, risks                 | A. Grant  | ??' + ??' |
31 10 Long, Kenneth
|                  | US financial plan, risks                 | P. Garbincius  | ??' + ??' |
32 1 Long, Kenneth
|                  | Unscheduled                              | ???’ - ???’| = ??'     |
33 12 Long, Kenneth
| *12:45-13:15*    |\3=. *Lunch*                                  |
34
| *13:15-??:??*    |\3=. *RLSR closed session – critical findings*|
35
| *??:??-??:??*    |\3=. *Step IV, commissioning, operations and control*              |
36 1 Long, Kenneth
|                  | Step IV commissioning and operations planning; overview       | S. Boyd      | ??' + ??' |
37
|                  | MICE Muon Beam and MICE channel optics and commissioning plan | J. Pasternak | ??' + ??' |
38
|                  | Step IV measurements and analysis planning                    | C. Rogers    | ??' + ??' |
39 3 Long, Kenneth
|                  | Controls and monitoring                                       | P. Hanlet    | ??' + ??' |
40
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
41 12 Long, Kenneth
|*15:30-??:??*     |\3=. *Closed session, report writing*                              |
42
|*16:00-??:??*     |\3=. *Reconstruction, simulation and data flow*                      |
43
|                  | Software, computing and data processing; overview             | D. Rajaram   | ??' + ??' |
44 1 Long, Kenneth
|                  | Reconstruction; online, offline and batch                     | A. Dobbs     | ??' + ??' |
45
|                  | Simulation and configuration management                       | R. Bayes     | ??' + ??' |
46 3 Long, Kenneth
|                  | Data flow: from front-end boards to automatic batch processing| Y. Karadzhov | ??' + ??' |
47 1 Long, Kenneth
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
48 12 Long, Kenneth
|*17:30-18:00*     |\3=. *Closed session, report writing*                              |
49
|*18:00*           |\3=. *Adjourn*                                                     |
50 1 Long, Kenneth
     
51 4 Long, Kenneth
h3. Friday 17 April 2015
52 2 Long, Kenneth
53 4 Long, Kenneth
h4. MPB-9 outline agenda
54 3 Long, Kenneth
55 12 Long, Kenneth
|\4=. *_17 April 2015_* |
56
|*09:00-??:??*     |\3=. *Cooling-demonstration integration, SC magnets and RF*        |
57
|                  | Focus-coils, absorbers and LH2 system for Step IV             | S. Watson    | ??' + ??' |
58 1 Long, Kenneth
|                  | Cavity modules and test programme, PRY and spectrometer solenoids | A. Bross | ??' + ??' |
59
|                  | RF-power distribution                                         | K. Ronald    | ??' + ??' |
60
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
61 12 Long, Kenneth
|*10:30-??:??*     |\3=. *Closed session, report writing*                              |
62
|*11:30-??:??*     |\3=. *Close-out with MICE managenent                               |
63
|*12:00-??:??*     |\3=. *Lunch*                                                       |
64
|*13:00*           |\3=. *Adjourn for report writing*                                  |
65 1 Long, Kenneth
66 4 Long, Kenneth
h4. FAC outline agenda
67 2 Long, Kenneth
68 1 Long, Kenneth
* To be posted.
69
70 2 Long, Kenneth
h4. Backup presentations:
71
72 1 Long, Kenneth
* To be posted.
73
74 4 Long, Kenneth
h3. Supporting documents:
75
* To be posted
76 1 Long, Kenneth
77
[[governance:External|Back]]