h1. MICE Project Board and Resource Loaded Schedule Review, April 2015
2 1 Long, Kenneth
3 4 Long, Kenneth
h2. Documentation
4
5
* RLSR:
6
** "Resource loaded schedule, costs and risks for the completion of the MICE project":
7 7 Long, Kenneth
*** Present draft (17Mar15): PDF: attachment:RLSR-report.pdf; ZIP: attachment:01-RLSR-project-summary.zip
8 4 Long, Kenneth
9
* MPB:
10
** "Status report":
11 8 Long, Kenneth
*** Present draft (17Mar15): PDF: attachment:MPB-report.pdf; ZIP: attachment:01-MPB-summary.zip
12 4 Long, Kenneth
13
h2. RLSR, MPB & FAC outline agendas – 16 & 17 April 2015
14 6 Long, Kenneth
15 1 Long, Kenneth
*Venue*
16
17 4 Long, Kenneth
h3. Thursday, 16 April 2015
18 1 Long, Kenneth
19 4 Long, Kenneth
h3. RLSR & MPB-9 outline agendas
20 1 Long, Kenneth
21 9 Long, Kenneth
|\4=. *_16 April 2015_* |
22
|*09:00-09:45*     |\3=. *RLSR closed session – introduction*     |
23 1 Long, Kenneth
|                  | Project overview                         | K. Long   | ??' + ??' |
24 3 Long, Kenneth
|*??:??-??:??*     | *RLSR presentations & questions*         |
25 9 Long, Kenneth
|                  | Schedule to completion, project risks and overview of critical interfaces | R. Preece | ??' + ??' |
26
|                  | Re-baselined deliverables, critical decision points and status of US deliverables | M. Palmer | ??' + ??' |
27 1 Long, Kenneth
|                  | UK financial plan, risks                 | A. Grant  | ??' + ??' |
28 10 Long, Kenneth
|                  | US financial plan, risks                 | P. Garbincius  | ??' + ??' |
29 1 Long, Kenneth
|                  | Unscheduled                              | ???’ - ???’| = ??'     |
30 3 Long, Kenneth
| *12:45-13:15*    | *Lunch*                                  |
31
| *13:15-??:??*    | *RLSR closed session – critical findings*|
32
| *??:??-??:??*    | *Step IV, commissioning, operations and control*              |
33 1 Long, Kenneth
|                  | Step IV commissioning and operations planning; overview       | S. Boyd      | ??' + ??' |
34
|                  | MICE Muon Beam and MICE channel optics and commissioning plan | J. Pasternak | ??' + ??' |
35
|                  | Step IV measurements and analysis planning                    | C. Rogers    | ??' + ??' |
36 3 Long, Kenneth
|                  | Controls and monitoring                                       | P. Hanlet    | ??' + ??' |
37
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
38 2 Long, Kenneth
|*15:30-??:??*     | *Closed session, report writing*                              |
39 1 Long, Kenneth
|*16:00-??:??*     | Reconstruction, simulation and data flow                      |
40
|                  | Softawre, computing and data processing; overview             | D. Rajaram   | ??' + ??' |
41
|                  | Reconstruction; online, offline and batch                     | A. Dobbs     | ??' + ??' |
42
|                  | Simulation and configuration management                       | R. Bayes     | ??' + ??' |
43 3 Long, Kenneth
|                  | Data flow: from front-end boards to automatic batch processing| Y. Karadzhov | ??' + ??' |
44 1 Long, Kenneth
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
45
|*17:30-18:00*     | *Closed session, report writing*                              |
46 3 Long, Kenneth
|*18:00*           | *Adjourn*                                                     |
47 1 Long, Kenneth
     
48 4 Long, Kenneth
h3. Friday 17 April 2015
49 2 Long, Kenneth
50 4 Long, Kenneth
h4. MPB-9 outline agenda
51 3 Long, Kenneth
52
|*_17 April 2015_* |
53 2 Long, Kenneth
|*09:00-??:??*     | *Cooling-demonstration integration, SC magnets and RF*        |
54
|                  | Focus-coils, liquid-hydrogen system and absorbers             | S. Watson    | ??' + ??' |
55 1 Long, Kenneth
|                  | Cavity modules and test programme, PRY and spectrometer solenoids | A. Bross | ??' + ??' |
56
|                  | RF-power distribution                                         | K. Ronald    | ??' + ??' |
57
|                  | Unscheduled                                                   | ???’ - ???’   | = ??'     |
58 2 Long, Kenneth
|*10:30-??:??*     | *Closed session, report writing*                              |
59 1 Long, Kenneth
|*11:30-??:??*     | *Close-out with MICE managenent                               |
60
|*12:00-??:??*     | *Lunch*                                                       |
61
|*13:00*           | *Adjourn for report writing*                                  |
62
63 4 Long, Kenneth
h4. FAC outline agenda
64 2 Long, Kenneth
65 1 Long, Kenneth
* To be posted.
66
67 2 Long, Kenneth
h4. Backup presentations:
68
69 1 Long, Kenneth
* To be posted.
70
71 4 Long, Kenneth
h3. Supporting documents:
72
* To be posted
73 1 Long, Kenneth
74
[[governance:External|Back]]