Project

General

Profile

2014-11-24-Review » History » Version 8

Long, Kenneth, 10 November 2014 21:22

1 1 Long, Kenneth
h1. 2014-11-24-Review
2
3 5 Long, Kenneth
h2. Documentation
4 1 Long, Kenneth
5
* RLSR:
6 6 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2885/2014-11-10-RLSR-report.pdf
7 1 Long, Kenneth
8
* Response to feedback:
9 8 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2888/2014-11-10-ResponseToFeedback.pdf
10 1 Long, Kenneth
*** Supporting documents:
11
**** The MICE Demonstration of Ionisation Cooling: Technical Note: attachment:MICE-Demonstration-Of-Ionisation-Cooling.pdf
12
**** Assumptions Document: attachment:2014-10-27-Assumptions-doc.pdf
13
**** Documentation of prioritised controls plan: attachment:
14
**** Online support plan: attachment:
15
**** Magnet commissioning at Step IV: attachment:
16
**** Commissioning and operations at Step IV: attachment:
17
**** RF test plan document: attachment:
18
**** Initial consideration of the running required for the demonstration of ionization cooling: attachment:
19
** Initial response (July 2014): attachment:2014-07-25-ResponseToFeedback.pdf
20
21
* MPB:
22
** Status report:
23
*** PDF: attachment:MPB-report.pdf
24
*** Tar ball: attachment:MPB-report.tar.gz
25
*** PDF: attachment:MPB-report-v2.pdf
26
*** Tar ball: attachment:MPB-report-v2.zip
27
28
[[governance:External|Back]]