Actions
2014-11-24-Review » History » Revision 8
« Previous |
Revision 8/48
(diff)
| Next »
Long, Kenneth, 10 November 2014 21:22
2014-11-24-Review¶
Documentation¶
- Response to feedback:
- Resource loaded schedule, costs and risks for the completion of the MICE project
- Supporting documents:
- The MICE Demonstration of Ionisation Cooling: Technical Note: attachment:MICE-Demonstration-Of-Ionisation-Cooling.pdf
- Assumptions Document: attachment:2014-10-27-Assumptions-doc.pdf
- Documentation of prioritised controls plan: attachment:
- Online support plan: attachment:
- Magnet commissioning at Step IV: attachment:
- Commissioning and operations at Step IV: attachment:
- RF test plan document: attachment:
- Initial consideration of the running required for the demonstration of ionization cooling: attachment:
- Supporting documents:
- Initial response (July 2014): attachment:2014-07-25-ResponseToFeedback.pdf
- Resource loaded schedule, costs and risks for the completion of the MICE project
- MPB:
- Status report:
- PDF: attachment:MPB-report.pdf
- Tar ball: attachment:MPB-report.tar.gz
- PDF: attachment:MPB-report-v2.pdf
- Tar ball: attachment:MPB-report-v2.zip
- Status report:
Updated by Long, Kenneth over 8 years ago · 8 revisions