Actions
2014-11-24-Review » History » Revision 6
« Previous |
Revision 6/48
(diff)
| Next »
Long, Kenneth, 10 November 2014 21:16
2014-11-24-Review¶
Documentation¶
- Response to feedback:
- Response to feedback (draft) updated 09Nov14:
- PDF:
- attachment:ResponseToFeedback.pdf
- Tar ball:
- attachment:ResponseToFeedback.tar.gz
- Supporting documents:
- The MICE Demonstration of Ionisation Cooling: Technical Note: attachment:MICE-Demonstration-Of-Ionisation-Cooling.pdf
- Assumptions Document: attachment:2014-10-27-Assumptions-doc.pdf
- Documentation of prioritised controls plan: attachment:
- Online support plan: attachment:
- Magnet commissioning at Step IV: attachment:
- Commissioning and operations at Step IV: attachment:
- RF test plan document: attachment:
- Initial consideration of the running required for the demonstration of ionization cooling: attachment:
- PDF:
- Initial response (July 2014): attachment:2014-07-25-ResponseToFeedback.pdf
- Response to feedback (draft) updated 09Nov14:
- MPB:
- Status report:
- PDF: attachment:MPB-report.pdf
- Tar ball: attachment:MPB-report.tar.gz
- PDF: attachment:MPB-report-v2.pdf
- Tar ball: attachment:MPB-report-v2.zip
- Status report:
Updated by Long, Kenneth over 8 years ago · 6 revisions