h1. 2014-11-24-Review
2
3 29 Long, Kenneth
h2. Agendas – RLSR4, MPB8 & FAC
4
5
h3. RLSR, MPB-8 & FAC outline agendas – November 24 & 25, 2014
6
*CR16 R80*
7
8
h4. Monday November 24th      
9
10
h5. RLSR & MPB-8 outline agendas
11
12
* *09:00-09:45* RLSR closed session – introduction
13 31 Long, Kenneth
* *09:45-10:25* Project overview — *K. Long*: 30’ + 10'
14 35 Long, Kenneth
** attachment:01-2014-11-24-Long.pptx
15 31 Long, Kenneth
* *10:25-12:45* RLSR presentations & questions 
16
** *10:25-11:05* Schedule to completion and project risks — *R. Preece*: 30’ + 10’
17 33 Long, Kenneth
*** attachment:02-Schedule_Cost_Risk_Benefit.ppt
18 31 Long, Kenneth
** *11:05-11:45* US project plan for MICE — *M. Palmer*: 30’ + 10’
19 33 Long, Kenneth
*** attachment:03-US-Project-Plan.pptx
20 1 Long, Kenneth
** *11:45-12:15* UK financial plan, risks — *A. Grant*: 20’ + 10’
21 33 Long, Kenneth
*** attachment:04-Slides-grant-2014-11-24_RLSR.pptx
22 31 Long, Kenneth
** *12:15-12:45* Unscheduled: 140’ - 110’ = 30'
23 29 Long, Kenneth
* *12:45-13:15* Lunch
24
* *13:15-14:00* RLSR closed session – critical findings
25
* *14:00-15:30* Data taking, simulation & reconstruction     
26
** *14:00-14:30* S/w&C overview — *D. Rajaram*: 20’ + 10’
27 34 Long, Kenneth
*** attachment:05-computing-mpb8.pdf
28 29 Long, Kenneth
** *14:30-15:00* Online — *P. Smith*: 20’ + 10'
29 34 Long, Kenneth
*** attachment:06-Data_Taking_and_Online.pdf
30 29 Long, Kenneth
** *15:00-15:30* MAUS (simulation and reconstruction) — *A. Dobbs*: 20’ + 10’
31 36 Dobbs, Adam
*** attachment:07-MAUS.pptx  attachment:07-MAUS.pdf
32 29 Long, Kenneth
** Unscheduled 90’ - 90' = 0'
33
* *15:30-16:00* Closed session, report writing
34
* *16:00-17:30* SC magnets & RF
35
** *16:00-16:30* FCs, liquid-hydrogen system and absorbers — *S. Watson*: 20’ + 10’
36 34 Long, Kenneth
*** attachment:08-MPB_24-11-14_AFC_LH2.ppt
37 29 Long, Kenneth
** *16:30-17:00* Cavity modules and test programme, PRY and SS — *A. Bross*: 20’ + 10’
38 34 Long, Kenneth
*** attachment:09-Cav-PRY-SS.pptx
39 29 Long, Kenneth
** *17:00-17:30* RF system overview and RF power — *K. Ronald*: 20’ + 10'
40 34 Long, Kenneth
*** attachment:10-RF_Status_Update-Nov-2014.pptx
41 29 Long, Kenneth
** Unscheduled 90’ - 90’ = 0'
42
* *17:30-18:00* SC magnets & RF closed session
43
* *18:00* Adjourn
44
     
45
h4. Tuesday November 25th
46
47
h5. MPB-8 outline agenda
48
49
* *9:00-10:30* Commissioning, operations & control         
50
** *09:00-09:35* Commissioning and operations overview — *S. Boyd*: 25’ + 10’
51 34 Long, Kenneth
*** attachment:11-MPBTalk_Ops.pdf
52 30 Long, Kenneth
** *09:35-09:50* MICE/ISIS liaison, the ISIS perspective — *S. Wakefield*: 10’ + 5’
53 29 Long, Kenneth
** *09:50-10:20* Controls and monitoring — *P. Hanlet*: 20’ + 10’
54 34 Long, Kenneth
*** attachment:13-mpbFa14_hanlet.pdf
55 29 Long, Kenneth
** *10:20-10:30* Unscheduled 90’ - 80’ = 10'
56
* *10:30-11:30* Closed session, report writing
57
* *11:30-12:00* Close-out with MICE management
58
* *12:00-13:00* Lunch 
59
* *13:00* Adjourn for report writing
60
61
h5. FAC outline agenda
62
63
* *15:30-15_40* Minutes of the last meeting including Actions and Matters Arising
64
* *15:40-16:00* Progress since the last FAC meeting and DOE review, Key Issues and Concerns: *Ken Long*
65
* *16:00-16:20* Schedule & Milestones: *Roy Preece*
66
* *16:20-16:40* Resource Loaded Schedule Review: Ian Robson
67
* *16:40-17:00* MPB Recommendations: Steve Peggs               
68
* *17:00-17:20* Funding Status (Statement from each representative)
69
* *17:20-17:30* Common Fund: *Paul Soler*
70
* *17:30-* Any other business     
71
72 5 Long, Kenneth
h2. Documentation
73 1 Long, Kenneth
74 28 Long, Kenneth
* Single PDF containing all files:
75
** Concatenated pdf: attachment:00-2014-11-11-All-files.pdf
76
77 1 Long, Kenneth
* RLSR:
78 6 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2885/2014-11-10-RLSR-report.pdf
79 37 Long, Kenneth
** "Tracking milestones for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/3041/2014-11-20-TrackingMilestones.pdf
80 1 Long, Kenneth
81
* Response to feedback:
82 8 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2888/2014-11-10-ResponseToFeedback.pdf
83 9 Long, Kenneth
84 26 Long, Kenneth
* MPB:
85 27 Long, Kenneth
** "Status report":http://micewww.pp.rl.ac.uk/attachments/2906/2014-11-11-MPB-report.pdf
86 26 Long, Kenneth
87 9 Long, Kenneth
* Supporting documents:
88
** "The MICE Demonstration of Ionisation Cooling: Technical Note":http://mice.iit.edu/micenotes/public/pdf/MICE0452/MICE0452.pdf
89 24 Long, Kenneth
** "MICE Assumptions Document":http://micewww.pp.rl.ac.uk/attachments/2893/2014-11-10-Assumptions-doc.pdf
90 11 Long, Kenneth
** "Documentation of prioritised controls plan":http://micewww.pp.rl.ac.uk/attachments/2882/Controls_System_Priotitised_Plan_v5.pdf
91 12 Long, Kenneth
** "Online support plan":http://micewww.pp.rl.ac.uk/attachments/2870/On_Call_Responsibilities_V05.pdf
92 22 Long, Kenneth
** "Magnet commissioning at Step IV":http://micewww.pp.rl.ac.uk/attachments/2891/2014-11-10-Magnet_and_Beam_Commissioning.pdf
93 25 Long, Kenneth
** "Commissioning and operations at Step IV":http://micewww.pp.rl.ac.uk/attachments/2897/2014-11-10-Step-IV-Commissioning-n-Operations.pdf
94 20 Long, Kenneth
** "RF test plan and consideration of commissioning of ionization cooling demonstration":http://micewww.pp.rl.ac.uk/attachments/2890/2014-11-10-ICD-test-n-commission.pdf
95 1 Long, Kenneth
** "Initial consideration of the running required for the demonstration of ionization cooling":http://micewww.pp.rl.ac.uk/attachments/2886/2014-11-10-ICD-initial-ops-plan.pdf
96
** Response to recommendations of DOE August 2014 review of MAP and MICE: attachment:DOE_Response_2014_0925_FINAL.pdf
97