2014-11-24-Review » History » Version 31

Long, Kenneth, 21 November 2014 18:44

1 1 Long, Kenneth
h1. 2014-11-24-Review
2
3 29 Long, Kenneth
h2. Agendas – RLSR4, MPB8 & FAC
4
5
h3. RLSR, MPB-8 & FAC outline agendas – November 24 & 25, 2014
6
*CR16 R80*
7
8
h4. Monday November 24th      
9
10
h5. RLSR & MPB-8 outline agendas
11
12
* *09:00-09:45* RLSR closed session – introduction
13 31 Long, Kenneth
* *09:45-10:25* Project overview — *K. Long*: 30’ + 10'
14
* *10:25-12:45* RLSR presentations & questions 
15
** *10:25-11:05* Schedule to completion and project risks — *R. Preece*: 30’ + 10’
16
** *11:05-11:45* US project plan for MICE — *M. Palmer*: 30’ + 10’
17
** *11:45-12:15* UK financial plan, risks — *A. Grant*: 20’ + 10’
18 29 Long, Kenneth
*** attachment:Slides-grant-2014-11-24_RLSR.pptx
19 31 Long, Kenneth
** *12:15-12:45* Unscheduled: 140’ - 110’ = 30'
20 29 Long, Kenneth
* *12:45-13:15* Lunch
21
* *13:15-14:00* RLSR closed session – critical findings
22
* *14:00-15:30* Data taking, simulation & reconstruction     
23
** *14:00-14:30* S/w&C overview — *D. Rajaram*: 20’ + 10’
24
** *14:30-15:00* Online — *P. Smith*: 20’ + 10'
25
** *15:00-15:30* MAUS (simulation and reconstruction) — *A. Dobbs*: 20’ + 10’
26
** Unscheduled 90’ - 90' = 0'
27
* *15:30-16:00* Closed session, report writing
28
* *16:00-17:30* SC magnets & RF
29
** *16:00-16:30* FCs, liquid-hydrogen system and absorbers — *S. Watson*: 20’ + 10’
30
** *16:30-17:00* Cavity modules and test programme, PRY and SS — *A. Bross*: 20’ + 10’
31
** *17:00-17:30* RF system overview and RF power — *K. Ronald*: 20’ + 10'
32
** Unscheduled 90’ - 90’ = 0'
33
* *17:30-18:00* SC magnets & RF closed session
34
* *18:00* Adjourn
35
     
36
h4. Tuesday November 25th
37
38
h5. MPB-8 outline agenda
39
40
* *9:00-10:30* Commissioning, operations & control         
41
** *09:00-09:35* Commissioning and operations overview — *S. Boyd*: 25’ + 10’
42 30 Long, Kenneth
** *09:35-09:50* MICE/ISIS liaison, the ISIS perspective — *S. Wakefield*: 10’ + 5’
43 29 Long, Kenneth
** *09:50-10:20* Controls and monitoring — *P. Hanlet*: 20’ + 10’
44
** *10:20-10:30* Unscheduled 90’ - 80’ = 10'
45
* *10:30-11:30* Closed session, report writing
46
* *11:30-12:00* Close-out with MICE management
47
* *12:00-13:00* Lunch 
48
* *13:00* Adjourn for report writing
49
50
h5. FAC outline agenda
51
52
* *15:30-15_40* Minutes of the last meeting including Actions and Matters Arising
53
* *15:40-16:00* Progress since the last FAC meeting and DOE review, Key Issues and Concerns: *Ken Long*
54
* *16:00-16:20* Schedule & Milestones: *Roy Preece*
55
* *16:20-16:40* Resource Loaded Schedule Review: Ian Robson
56
* *16:40-17:00* MPB Recommendations: Steve Peggs               
57
* *17:00-17:20* Funding Status (Statement from each representative)
58
* *17:20-17:30* Common Fund: *Paul Soler*
59
* *17:30-* Any other business     
60
61 5 Long, Kenneth
h2. Documentation
62 1 Long, Kenneth
63 28 Long, Kenneth
* Single PDF containing all files:
64
** Concatenated pdf: attachment:00-2014-11-11-All-files.pdf
65
66 1 Long, Kenneth
* RLSR:
67 6 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2885/2014-11-10-RLSR-report.pdf
68 1 Long, Kenneth
69
* Response to feedback:
70 8 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2888/2014-11-10-ResponseToFeedback.pdf
71 9 Long, Kenneth
72 26 Long, Kenneth
* MPB:
73 27 Long, Kenneth
** "Status report":http://micewww.pp.rl.ac.uk/attachments/2906/2014-11-11-MPB-report.pdf
74 26 Long, Kenneth
75 9 Long, Kenneth
* Supporting documents:
76
** "The MICE Demonstration of Ionisation Cooling: Technical Note":http://mice.iit.edu/micenotes/public/pdf/MICE0452/MICE0452.pdf
77 24 Long, Kenneth
** "MICE Assumptions Document":http://micewww.pp.rl.ac.uk/attachments/2893/2014-11-10-Assumptions-doc.pdf
78 11 Long, Kenneth
** "Documentation of prioritised controls plan":http://micewww.pp.rl.ac.uk/attachments/2882/Controls_System_Priotitised_Plan_v5.pdf
79 12 Long, Kenneth
** "Online support plan":http://micewww.pp.rl.ac.uk/attachments/2870/On_Call_Responsibilities_V05.pdf
80 22 Long, Kenneth
** "Magnet commissioning at Step IV":http://micewww.pp.rl.ac.uk/attachments/2891/2014-11-10-Magnet_and_Beam_Commissioning.pdf
81 25 Long, Kenneth
** "Commissioning and operations at Step IV":http://micewww.pp.rl.ac.uk/attachments/2897/2014-11-10-Step-IV-Commissioning-n-Operations.pdf
82 20 Long, Kenneth
** "RF test plan and consideration of commissioning of ionization cooling demonstration":http://micewww.pp.rl.ac.uk/attachments/2890/2014-11-10-ICD-test-n-commission.pdf
83 1 Long, Kenneth
** "Initial consideration of the running required for the demonstration of ionization cooling":http://micewww.pp.rl.ac.uk/attachments/2886/2014-11-10-ICD-initial-ops-plan.pdf
84
** Response to recommendations of DOE August 2014 review of MAP and MICE: attachment:DOE_Response_2014_0925_FINAL.pdf
85
** "Initial response (July 2014) to recommendations":http://micewww.pp.rl.ac.uk/attachments/2346/2014-07-25-ResponseToFeedback.pdf
86 18 Long, Kenneth
87 1 Long, Kenneth
88
[[governance:External|Back]]