Project

General

Profile

2014-11-24-Review » History » Version 23

Long, Kenneth, 10 November 2014 21:58

1 1 Long, Kenneth
h1. 2014-11-24-Review
2
3 5 Long, Kenneth
h2. Documentation
4 1 Long, Kenneth
5
* RLSR:
6 6 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2885/2014-11-10-RLSR-report.pdf
7 1 Long, Kenneth
8
* Response to feedback:
9 8 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2888/2014-11-10-ResponseToFeedback.pdf
10 9 Long, Kenneth
11
* Supporting documents:
12
** "The MICE Demonstration of Ionisation Cooling: Technical Note":http://mice.iit.edu/micenotes/public/pdf/MICE0452/MICE0452.pdf
13 23 Long, Kenneth
** "MICE Assumptions Document":http://micewww.pp.rl.ac.uk/attachments/2892/2014-11-10-Assumptions-doc.pdf
14 11 Long, Kenneth
** "Documentation of prioritised controls plan":http://micewww.pp.rl.ac.uk/attachments/2882/Controls_System_Priotitised_Plan_v5.pdf
15 12 Long, Kenneth
** "Online support plan":http://micewww.pp.rl.ac.uk/attachments/2870/On_Call_Responsibilities_V05.pdf
16 22 Long, Kenneth
** "Magnet commissioning at Step IV":http://micewww.pp.rl.ac.uk/attachments/2891/2014-11-10-Magnet_and_Beam_Commissioning.pdf
17 13 Long, Kenneth
** "Commissioning and operations at Step IV":http://micewww.pp.rl.ac.uk/attachments/2884/2014-11-10-Step-IV-Commissioning-n-Operations.pdf
18 20 Long, Kenneth
** "RF test plan and consideration of commissioning of ionization cooling demonstration":http://micewww.pp.rl.ac.uk/attachments/2890/2014-11-10-ICD-test-n-commission.pdf
19 15 Long, Kenneth
** "Initial consideration of the running required for the demonstration of ionization cooling":http://micewww.pp.rl.ac.uk/attachments/2886/2014-11-10-ICD-initial-ops-plan.pdf
20 17 Long, Kenneth
** Response to recommendations of DOE August 2014 review of MAP and MICE: attachment:DOE_Response_2014_0925_FINAL.pdf
21 16 Long, Kenneth
** "Initial response (July 2014) to recommendations":http://micewww.pp.rl.ac.uk/attachments/2346/2014-07-25-ResponseToFeedback.pdf
22 1 Long, Kenneth
23
* MPB:
24
** Status report:
25 18 Long, Kenneth
26 1 Long, Kenneth
27
[[governance:External|Back]]