Long, Kenneth, 10 November 2014 21:38

1 1 Long, Kenneth
h1. 2014-11-24-Review
2
3 5 Long, Kenneth
h2. Documentation
4 1 Long, Kenneth
5
* RLSR:
6 6 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2885/2014-11-10-RLSR-report.pdf
7 1 Long, Kenneth
8
* Response to feedback:
9 8 Long, Kenneth
** "Resource loaded schedule, costs and risks for the completion of the MICE project":http://micewww.pp.rl.ac.uk/attachments/2888/2014-11-10-ResponseToFeedback.pdf
10 9 Long, Kenneth
11
* Supporting documents:
12
** "The MICE Demonstration of Ionisation Cooling: Technical Note":http://mice.iit.edu/micenotes/public/pdf/MICE0452/MICE0452.pdf
13
** Assumptions Document: attachment:2014-10-27-Assumptions-doc.pdf
14 11 Long, Kenneth
** "Documentation of prioritised controls plan":http://micewww.pp.rl.ac.uk/attachments/2882/Controls_System_Priotitised_Plan_v5.pdf
15 12 Long, Kenneth
** "Online support plan":http://micewww.pp.rl.ac.uk/attachments/2870/On_Call_Responsibilities_V05.pdf
16 9 Long, Kenneth
** Magnet commissioning at Step IV: attachment:
17 13 Long, Kenneth
** "Commissioning and operations at Step IV":http://micewww.pp.rl.ac.uk/attachments/2884/2014-11-10-Step-IV-Commissioning-n-Operations.pdf
18 14 Long, Kenneth
** "RF test plan document":http://micewww.pp.rl.ac.uk/attachments/2887/MDIC_Test_and_Commissioning-6-no-comments.docx
19 15 Long, Kenneth
** "Initial consideration of the running required for the demonstration of ionization cooling":http://micewww.pp.rl.ac.uk/attachments/2886/2014-11-10-ICD-initial-ops-plan.pdf
20 9 Long, Kenneth
** DOE
21 16 Long, Kenneth
** "Initial response (July 2014) to recommendations":http://micewww.pp.rl.ac.uk/attachments/2346/2014-07-25-ResponseToFeedback.pdf
22 1 Long, Kenneth
23
* MPB:
24
** Status report:
25
*** PDF: attachment:MPB-report.pdf
26
*** Tar ball: attachment:MPB-report.tar.gz
27
*** PDF: attachment:MPB-report-v2.pdf
28
*** Tar ball: attachment:MPB-report-v2.zip
29
30