Project

General

Profile

2014-04-01-MEMO » History » Version 3

Long, Kenneth, 15 April 2014 11:57

1 1 Long, Kenneth
h1. 2014-04-01-MEMO
2
3
h2. MICE Experiment Management Office
4
5
h3. 15th April 2014; 14:00 BST
6
7
"Phone details":http://mice.iit.edu/phonebridge.html
8
9
* Meeting notes: attachment:
10
11
[[MEMO|Back]]
12
13
h4. Agenda
14
15
# *Introduction: KL*
16
# *Notes on previous meeting, status of actions: All*
17 2 Long, Kenneth
** *KL:* Discuss with JPa issues that lack of running other than activation run will cause. 
18 1 Long, Kenneth
# *Report/actions from MIPO: PMH*
19
# *Operations: capturing the plan to prepare for running: SB*
20
# *Operations plan Apr to Sep: SB/All*
21
** 04—06Apr14: 0.8Hz test;
22
*** MOM team writes MICE Note on results;
23
** 29—30Jun14: 0.8Hz activation run:
24
*** 16-hour run with MICE experiment; 16-hours rest, then survey;
25
*** Plan as MICE test run;
26 3 Long, Kenneth
# *Spares: CR*
27 1 Long, Kenneth
# *Status of remaining Step I publication(s): VB*
28
# *Preparation of MPB document and MPB presentations: All*
29
# *DONM*
30
** 29Apr14
31
# *AoB*
32 3 Long, Kenneth
** PMH: Online system admin
33 1 Long, Kenneth
34
[[MEMO|Back]]