Project

General

Profile

Actions

28-05-2015

Jan Efficiency updates:
- He has pushed his latest efficiency code.
- Looked at the where recon was failing for US/DS tracks.
- Jan will send Melissa a link to his efficiency stuff in his branch so that she can take a look.
- Melissa would like an imporvements on the e/pt ; Jan is currently fiddling with the acceotance criteria for each detector.

Melissa:
No update on dE/dx

Done:
DS Tracks (1005 - tweaks)
US Tracks (-dE/dx)

PDFs for all TOFS, KL, EMR, Trackers in large stats of e mu and pions

To Do:

Jan:
Final tweaks to DS tracks and efficiency
Throughgoing track efficiency
Be sure US tracks are ready for dE/dx/
start thinking about track fitting

Celeste:
Finish large stats pion and positron pdfs for all detectors
For throughgoing
US
DS
(efficiency purity based on them)

Melissa:
dE/dx
talk with subdetectors and determin alignment plan and beam
errors for Celeste

Future:
We need to be ready for throughgoing alignment:
We may need track fitting for the throughgoing and this may become urgent
determin fiducial angle cut for the above
Melissa talk with subdetectors and determin alignment plan and beam settings
All to agree thoughgoing alignment
Simulate PRY end plate??

Updated by George, Melissa over 8 years ago ยท 2 revisions