11-06-2015 » History » Version 3

George, Melissa, 11 June 2015 15:52

1 1 George, Melissa
h1. 11-06-2015
2 2 George, Melissa
3
Jan Efficiency updates:
4
- Latest efficiency looks pretty good
5
- Huge improvement since using tracker plane 4 rather than 2. What does this mean as the distance shouldn't make any difference????
6
  - Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed.  If no change then its dE/dx if change then there is a distance issue, which must be fixed.
7
- Expecting improvements again following Kalman changes next week.
8
9
Melissa:
10
No update on dE/dx
11
12
Done:
13
DS Tracks (1005 - tweaks)
14
US Tracks (-dE/dx)
15
16
PDFs for all TOFS, KL, EMR, Trackers in large stats of e mu and pions
17
18
To Do:
19
20
Jan:
21 3 George, Melissa
* Plot xy positions of hits in Tracker station 2 vs 4 in two diff colours same plot of x against y.
22
* Plot x positions of MC hits-recon hits against local recon error
23
* Plot y positions of MC hits-recon hits against local recon error (in all these cases they should never be outside the error.
24
* Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed.  If no change then its    dE/dx if change then there is a distance issue, which must be fixed.
25
* Throughgoing track efficiency
26
* Be sure US tracks are ready for dE/dx/
27
* start thinking about track fitting
28 2 George, Melissa
29
Celeste:
30
Finish large stats pion and positron pdfs for all detectors
31
   For throughgoing
32
       US
33
       DS
34
(efficiency purity based on them)
35
36
Melissa:
37
dE/dx
38
talk with subdetectors and determin alignment plan and beam 
39
errors for Celeste
40
41
Future:
42
We need to be ready for throughgoing alignment:
43
  We may need track fitting for the throughgoing and this may become urgent
44
  determin fiducial angle cut for the above
45
  Melissa talk with subdetectors and determin alignment plan and beam settings
46
  All to agree thoughgoing alignment
47
  Simulate PRY end plate??