11-06-2015 » History » Version 2
George, Melissa, 11 June 2015 15:07
1 | 1 | George, Melissa | h1. 11-06-2015 |
---|---|---|---|
2 | 2 | George, Melissa | |
3 | Jan Efficiency updates: |
||
4 | - Latest efficiency looks pretty good |
||
5 | - Huge improvement since using tracker plane 4 rather than 2. What does this mean as the distance shouldn't make any difference???? |
||
6 | - Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed. If no change then its dE/dx if change then there is a distance issue, which must be fixed. |
||
7 | - Expecting improvements again following Kalman changes next week. |
||
8 | |||
9 | Melissa: |
||
10 | No update on dE/dx |
||
11 | |||
12 | Done: |
||
13 | DS Tracks (1005 - tweaks) |
||
14 | US Tracks (-dE/dx) |
||
15 | |||
16 | PDFs for all TOFS, KL, EMR, Trackers in large stats of e mu and pions |
||
17 | |||
18 | To Do: |
||
19 | |||
20 | Jan: |
||
21 | *Plot xy positions of hits in Tracker station 2 vs 4 in two diff colours same plot of x against y. |
||
22 | *Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed. If no change then its dE/dx if change then there is a distance issue, which must be fixed. |
||
23 | Final tweaks to DS tracks and efficiency |
||
24 | Throughgoing track efficiency |
||
25 | Be sure US tracks are ready for dE/dx/ |
||
26 | start thinking about track fitting |
||
27 | |||
28 | Celeste: |
||
29 | Finish large stats pion and positron pdfs for all detectors |
||
30 | For throughgoing |
||
31 | US |
||
32 | DS |
||
33 | (efficiency purity based on them) |
||
34 | |||
35 | Melissa: |
||
36 | dE/dx |
||
37 | talk with subdetectors and determin alignment plan and beam |
||
38 | errors for Celeste |
||
39 | |||
40 | Future: |
||
41 | We need to be ready for throughgoing alignment: |
||
42 | We may need track fitting for the throughgoing and this may become urgent |
||
43 | determin fiducial angle cut for the above |
||
44 | Melissa talk with subdetectors and determin alignment plan and beam settings |
||
45 | All to agree thoughgoing alignment |
||
46 | Simulate PRY end plate?? |