h1. 11-06-2015
2 2 George, Melissa
3
Jan Efficiency updates:
4
- Latest efficiency looks pretty good
5
- Huge improvement since using tracker plane 4 rather than 2. What does this mean as the distance shouldn't make any difference????
6
  - Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed.  If no change then its dE/dx if change then there is a distance issue, which must be fixed.
7
- Expecting improvements again following Kalman changes next week.
8
9
Melissa:
10
No update on dE/dx
11
12
Done:
13
DS Tracks (1005 - tweaks)
14
US Tracks (-dE/dx)
15
16
PDFs for all TOFS, KL, EMR, Trackers in large stats of e mu and pions
17
18
To Do:
19
20
Jan:
21
*Plot xy positions of hits in Tracker station 2 vs 4 in two diff colours same plot of x against y.
22
*Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed.  If no change then its dE/dx if change then there is a distance issue, which must be fixed.
23
Final tweaks to DS tracks and efficiency
24
Throughgoing track efficiency
25
Be sure US tracks are ready for dE/dx/
26
start thinking about track fitting
27
28
Celeste:
29
Finish large stats pion and positron pdfs for all detectors
30
   For throughgoing
31
       US
32
       DS
33
(efficiency purity based on them)
34
35
Melissa:
36
dE/dx
37
talk with subdetectors and determin alignment plan and beam 
38
errors for Celeste
39
40
Future:
41
We need to be ready for throughgoing alignment:
42
  We may need track fitting for the throughgoing and this may become urgent
43
  determin fiducial angle cut for the above
44
  Melissa talk with subdetectors and determin alignment plan and beam settings
45
  All to agree thoughgoing alignment
46
  Simulate PRY end plate??