Project

General

Profile

Actions

11-06-2015 » History » Revision 2

« Previous | Revision 2/4 (diff) | Next »
George, Melissa, 11 June 2015 15:07


11-06-2015

Jan Efficiency updates:
- Latest efficiency looks pretty good
- Huge improvement since using tracker plane 4 rather than 2. What does this mean as the distance shouldn't make any difference????
- Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed. If no change then its dE/dx if change then there is a distance issue, which must be fixed.
- Expecting improvements again following Kalman changes next week.

Melissa:
No update on dE/dx

Done:
DS Tracks (1005 - tweaks)
US Tracks (-dE/dx)

PDFs for all TOFS, KL, EMR, Trackers in large stats of e mu and pions

To Do:

Jan:
*Plot xy positions of hits in Tracker station 2 vs 4 in two diff colours same plot of x against y.
*Remove TOF2 and KL run again comparing stations 2 and 4 now that possible energy loss material is removed. If no change then its dE/dx if change then there is a distance issue, which must be fixed.
Final tweaks to DS tracks and efficiency
Throughgoing track efficiency
Be sure US tracks are ready for dE/dx/
start thinking about track fitting

Celeste:
Finish large stats pion and positron pdfs for all detectors
For throughgoing
US
DS
(efficiency purity based on them)

Melissa:
dE/dx
talk with subdetectors and determin alignment plan and beam
errors for Celeste

Future:
We need to be ready for throughgoing alignment:
We may need track fitting for the throughgoing and this may become urgent
determin fiducial angle cut for the above
Melissa talk with subdetectors and determin alignment plan and beam settings
All to agree thoughgoing alignment
Simulate PRY end plate??

Updated by George, Melissa over 8 years ago · 2 revisions