Project

General

Profile

Wiki » History » Version 13

Preece, Roy, 07 January 2015 09:07

1 2 Preece, Roy
h1. Drawings for discussion and approval
2
3 10 Preece, Roy
_*Drawing files posted in this area are for discussion in meetings leading to approval. Once approved the drawings will be posted in the issue area of the Electrical Wiki. Drawing files will be removed from this area when superseded or issued.*_
4 3 Preece, Roy
5
h2. Infrastructure Meeting 7th January 2015
6
7
Tray/trunking layout drawing which show the proposed changes to the trunking for the vacuum cables on the south side of the hall.
8 6 Preece, Roy
** attachment:204-70025_3.pdf
9 8 Preece, Roy
** attachment:204-70025_10.pdf
10
** attachment:204-70025_11.pdf
11 5 Preece, Roy
12 1 Rogers, Chris
Proposed Spectrometer Solenoid Chilled water system for the Energy Dump trays.
13 8 Preece, Roy
** attachment:Chilled_Water_System.pdf
14
15 11 Preece, Roy
h1. Drawings for discussion and approval
16
17
_*Drawings that have been discussed and approved and should be used for construction*_
18 7 Preece, Roy
19 12 Preece, Roy
h2. Rack Room 1
20
21
h2. Rack Room 2
22
23
h2. Trunking and Cable Tray
24
25
h2. Cable Routing
26
27 13 Preece, Roy
28
29
30 7 Preece, Roy
h2. Uploaded Files