Project

General

Profile

Wiki » History » Version 9

Long, Kenneth, 03 August 2014 11:22

1 2 Rogers, Chris
h1. DOE Reviews
2 3 Long, Kenneth
3
h2. DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014
4 4 Long, Kenneth
5
h3. Documents:
6
7 9 Long, Kenneth
# *_DRAFT_* *Status of the MICE Project*: attachment:DOE-Review-MICE-Status.pdf
8
** +To do:+
9
### Update US risk tables;
10
### Sign-off from US project team 
11 4 Long, Kenneth
** +Figures:+ 
12 8 Long, Kenneth
### Step IV Dashboard: attachment:Figure-1-MICE_Dashboard.pdf
13 6 Long, Kenneth
### Step IV baseline schedule milestones: attachment:Figure-2-Step_IV_milestones_Waterfall.pdf
14
### Step V critical path relating to Plan A: attachment:Figure-3-StepV_Critical_Path_Advanced.pdf
15
### Step V critical path relating to Plan B: attachment:Figure-4-StepV_Critical_Path_Flat_Funding.pdf
16 4 Long, Kenneth
** +Tables:+
17 7 Long, Kenneth
### Interface points identified in the MICE baseline-schedule analysis: attachment:Table-1-Delivered_Required_Dates.pdf
18
### Step IV baseline critical path: attachment:Table-2-Step_IV_Critical-Imminent-Near.pdf
19
### The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-3-StepV_Critical_Near_Advanced.pdf
20
### The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-4-StepV_Critical_Near_Flat.pdf
21 5 Long, Kenneth
22
[[governance:External|Back]]