DOE Reviews

DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014

Documents:

  1. Status of the MICE Project: attachment:DOE-Review-MICE-Status.pdf
    • Figures:
      1. Step IV Dashboard: attachment:Figure-1-MICE_Dashboard.pdf}
      2. Step IV baseline schedule milestones: attachment:Figure-2-Step_IV_milestones_Waterfall.pdf
      3. Step V critical path relating to Plan A: attachment:Figure-3-StepV_Critical_Path_Advanced.pdf
      4. Step V critical path relating to Plan B: attachment:Figure-4-StepV_Critical_Path_Flat_Funding.pdf
    • Tables:
      1. Interface points identified in the MICE baseline-schedule analysis: attachment:Table-1-Delivered_Required_Dates.pdf
      2. Step IV baseline critical path: attachment:Table-2-Step_IV_Critical-Imminent-Near.pdf
      3. The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-3-StepV_Critical_Near_Advanced.pdf
      4. The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-4-StepV_Critical_Near_Flat.pdf