Project

General

Profile

Wiki » History » Version 37

Long, Kenneth, 22 August 2014 08:11

1 2 Rogers, Chris
h1. DOE Reviews
2 3 Long, Kenneth
3
h2. DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014
4 4 Long, Kenneth
5 37 Long, Kenneth
h3. Presentations:
6
7
# K. Long: MICE and its global context; attachment:01-2014-08-12-LONG.pptx
8
# R. Preece: MICE-UK plan; attachment:02-MICE-UK_Plan_120814.ppt
9
# A. Bross: MICe-US construction effort; attachment:03-DOE_Review_MICE_construction_v11.pptx
10
# P. Garbincius: MICE-US resource-loaded schedule and budget profile; attachment:04-PHG_MICE.pptx
11
# D. Kaplan: MICE-US experimental contributions; attachment:05-Kaplan-MICE_MAP-DOE-Review-Aug2014-R11.pptx
12
13 4 Long, Kenneth
h3. Documents:
14
15 23 Long, Kenneth
# *document#95*
16 4 Long, Kenneth
** +Figures:+ 
17 30 Long, Kenneth
### Top: Drawing of a single lattice cell of the Feasibility II cooling channel: attachment:Figure-1a-StudyII.pdf.  Bottom: Rendered engineering drawing of MICE in the Step VI configuration: attachment:Figure-1b-StepVI.pdf
18 26 Long, Kenneth
### Steps in the staged implementation of MICE: attachment:Figure-2-MICE-steps.pdf
19 29 Long, Kenneth
### Step IV Dashboard: attachment:Figure-3-MICE_Dashboard.pdf
20
### Step IV baseline schedule milestones: attachment:Figure-4-Step_IV_milestones_Waterfall.pdf
21
### Step V critical path relating to Plan A: attachment:Figure-5-StepV_Critical_Path_Advanced.pdf
22
### Step V critical path relating to Plan B: attachment:Figure-6-StepV_Critical_Path_Flat_Funding.pdf
23
### Spend profile required to carry complete Step V according to Plan A: attachment:Figure-7-Advanced-UK-US_Finance.pdf
24
### Spend profile required to carry complete Step V according to Plan B: attachment:Figure-8-Flat_UK-Flat_US-UK-US_Finance.pdf
25 28 Long, Kenneth
### Comparison of the UK spend profiles required to deliver Step V according to Plans A and B compared with the profile required to deliver Step IV: attachment:Figure-9-MICE-UK_Funding_Profiles.pdf
26 36 Long, Kenneth
### Comparison of the US spend profiles required to deliver the components of Step V for which the US is responsible: attachment:Figure-10-MICE-US_Funding_Profiles.pdf
27 4 Long, Kenneth
** +Tables:+
28 26 Long, Kenneth
### Headlines of the minimal physics programme by Step in the staged implementation of the MICE programme: attachment:Table-1-PhysicsHeadlines.pdf
29 29 Long, Kenneth
### Interface points identified in the MICE baseline-schedule analysis: attachment:Table-2-Delivered_Required_Dates.pdf
30
### Step IV baseline critical path: attachment:Table-3-Step_IV_Critical-Imminent-Near.pdf
31
### The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-4-StepV_Critical_Near_Advanced.pdf
32
### The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-5-StepV_Critical_Near_Flat.pdf
33
### The UK requirement for the completion of Step V according to Plan A: attachment:Table-6-UK-Advanced_Spend_profile.pdf
34
### The UK requirement for the completion of Step V according to Plan B: attachment:Table-7-UK-Flat_funded_Spend_profile.pdf
35
### The UK requirement for the completion of MICE at Step IV: attachment:Table-8-UK-Stop_Step_IV_Spend_profile.pdf
36
### Top level risks for the sub-projects for which the UK is responsible: attachment:Table-9-STFC-RiskRegisterAug.pdf
37
### Top level risks for the sub-projects for which the US is responsible: attachment:Table-10-MAP-RiskRegister.pdf
38
### Risk history for US risks: attachment:Table-11-US-risk_history.pdf
39 19 Long, Kenneth
# *document#94*
40 35 Long, Kenneth
# *document#98*
41 33 Long, Kenneth
# *document#97*
42 31 Long, Kenneth
# *document#96*
43 15 Long, Kenneth
44 5 Long, Kenneth