Wiki » History » Revision 35
Revision 34 (Long, Kenneth, 04 August 2014 17:47) → Revision 35/37 (Long, Kenneth, 04 August 2014 17:50)
h1. DOE Reviews h2. DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014 h3. Documents: # *document#95* ** +Figures:+ ### Top: Drawing of a single lattice cell of the Feasibility II cooling channel: attachment:Figure-1a-StudyII.pdf. Bottom: Rendered engineering drawing of MICE in the Step VI configuration: attachment:Figure-1b-StepVI.pdf ### Steps in the staged implementation of MICE: attachment:Figure-2-MICE-steps.pdf ### Step IV Dashboard: attachment:Figure-3-MICE_Dashboard.pdf ### Step IV baseline schedule milestones: attachment:Figure-4-Step_IV_milestones_Waterfall.pdf ### Step V critical path relating to Plan A: attachment:Figure-5-StepV_Critical_Path_Advanced.pdf ### Step V critical path relating to Plan B: attachment:Figure-6-StepV_Critical_Path_Flat_Funding.pdf ### Spend profile required to carry complete Step V according to Plan A: attachment:Figure-7-Advanced-UK-US_Finance.pdf ### Spend profile required to carry complete Step V according to Plan B: attachment:Figure-8-Flat_UK-Flat_US-UK-US_Finance.pdf ### Comparison of the UK spend profiles required to deliver Step V according to Plans A and B compared with the profile required to deliver Step IV: attachment:Figure-9-MICE-UK_Funding_Profiles.pdf ### Comparison of the US spend profiles required to deliver the components of Step V for which the US is responsible: attachment:Figure-10-MICE-US_Funding _Profiles.pdf ** +Tables:+ ### Headlines of the minimal physics programme by Step in the staged implementation of the MICE programme: attachment:Table-1-PhysicsHeadlines.pdf ### Interface points identified in the MICE baseline-schedule analysis: attachment:Table-2-Delivered_Required_Dates.pdf ### Step IV baseline critical path: attachment:Table-3-Step_IV_Critical-Imminent-Near.pdf ### The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-4-StepV_Critical_Near_Advanced.pdf ### The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-5-StepV_Critical_Near_Flat.pdf ### The UK requirement for the completion of Step V according to Plan A: attachment:Table-6-UK-Advanced_Spend_profile.pdf ### The UK requirement for the completion of Step V according to Plan B: attachment:Table-7-UK-Flat_funded_Spend_profile.pdf ### The UK requirement for the completion of MICE at Step IV: attachment:Table-8-UK-Stop_Step_IV_Spend_profile.pdf ### Top level risks for the sub-projects for which the UK is responsible: attachment:Table-9-STFC-RiskRegisterAug.pdf ### Top level risks for the sub-projects for which the US is responsible: attachment:Table-10-MAP-RiskRegister.pdf ### Risk history for US risks: attachment:Table-11-US-risk_history.pdf # *document#94* # *document#98* *_DRAFT:_* *MICE Project Assumptions Document*: attachment:Assumptions-doc.pdf ** +To do:+ ### *KL/RP:* make final update for this issue on Monday 04Aug14. # *document#97* # *document#96* [[governance:External|Back]]