Project

General

Profile

Wiki » History » Revision 28

Revision 27 (Long, Kenneth, 04 August 2014 15:18) → Revision 28/37 (Long, Kenneth, 04 August 2014 15:41)

h1. DOE Reviews 

 h2. DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014 

 h3. Documents: 

 # *document#95* 
 ** +Figures:+  
 ### Top: Drawing of a single lattice cell of the Feasibility II cooling channel: attachment:Figure-1a-StudyII.pdf.    Bottom: Rendered engineering drawing of MICE in the Step VI configuration: Figure-1b-StepVI.pdf Figure-1b-StepVI.jpg 
 ### Steps in the staged implementation of MICE: attachment:Figure-2-MICE-steps.pdf 
 ### Step IV Dashboard: attachment:Figure-1-MICE_Dashboard.pdf 
 ### Step IV baseline schedule milestones: attachment:Figure-2-Step_IV_milestones_Waterfall.pdf 
 ### Step V critical path relating to Plan A: attachment:Figure-3-StepV_Critical_Path_Advanced.pdf 
 ### Step V critical path relating to Plan B: attachment:Figure-4-StepV_Critical_Path_Flat_Funding.pdf 
 ### Spend profile required to carry complete Step V according to Plan A: attachment:Figure-5-Advanced-UK-US_Finance.pdf 
 ### Spend profile required to carry complete Step V according to Plan B: attachment:Figure-6-Flat_UK-Flat_US-UK-US_Finance.pdf 
 ### Comparison of the UK spend profiles required to deliver Step V according to Plans A and B compared with the profile required to deliver Step IV: attachment:Figure-9-MICE-UK_Funding_Profiles.pdf 
 ** +Tables:+ 
 ### Headlines of the minimal physics programme by Step in the staged implementation of the MICE programme: attachment:Table-1-PhysicsHeadlines.pdf 
 ### Interface points identified in the MICE baseline-schedule analysis: attachment:Table-1-Delivered_Required_Dates.pdf 
 ### Step IV baseline critical path: attachment:Table-2-Step_IV_Critical-Imminent-Near.pdf 
 ### The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-3-StepV_Critical_Near_Advanced.pdf 
 ### The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-4-StepV_Critical_Near_Flat.pdf 
 ### The UK requirement for the completion of Step V according to Plan A: attachment:Table-5-UK-Advanced_Spend_profile.pdf 
 ### The UK requirement for the completion of Step V according to Plan B: attachment:Table-6-UK-Flat_funded_Spend_profile.pdf 
 ### The UK requirement for the completion of MICE at Step IV: attachment:Table-7-UK-Stop_Step_IV_Spend_profile.pdf 
 ### Top level risks for the sub-projects for which the UK is responsible: attachment:Table-8-STFC-RiskRegisterAug.pdf 
 ### Top level risks for the sub-projects for which the US is responsible: attachment:Table-9-MAP-RiskRegister.pdf 
 ### Risk history for US risks: attachment:Table-10-US-risk_history.pdf 
 # *document#94* 
 # *_DRAFT:_* *MICE Project Assumptions Document*: attachment:Assumptions-doc.pdf 
 ** +To do:+ 
 ### *KL/RP:* make final update for this issue on Monday 04Aug14. 
 # *_DRAFT:_* *Planning the MICE Step IV Data Campaign*: attachment:DataPlan.pdf 
 ** +To do:+ 
 ### *SB/VB:* make final update for on Monday 04Aug14. 
 # *_DRAFT:_* *MICE Step IV magnet and beamline commissioning plan*: attachment:Magnet_and_Beam_Commissioning.pdf 
 ** +To do:+ 
 ### *JPa/KL:* make final update for on Monday 04Aug14. 
 # *_DRAFT:_* *MICE Step IV instrumentation commissioning plan*: attachment:InstrPlan.pdf 
 ** +To do:+ 
 ### *PS:* make final update for on Monday 04Aug14. 

 [[governance:External|Back]]