DOE Reviews

DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014

Documents:

  1. Delivering the MICE project; options for success
    • Figures:
      1. Top: Drawing of a single lattice cell of the Feasibility II cooling channel: Figure-1a-StudyII.pdf. Bottom: Rendered engineering drawing of MICE in the Step VI configuration: Figure-1b-StepVI.jpg.
      2. Step IV Dashboard: attachment:Figure-1-MICE_Dashboard.pdf
      3. Step IV baseline schedule milestones: attachment:Figure-2-Step_IV_milestones_Waterfall.pdf
      4. Step V critical path relating to Plan A: attachment:Figure-3-StepV_Critical_Path_Advanced.pdf
      5. Step V critical path relating to Plan B: attachment:Figure-4-StepV_Critical_Path_Flat_Funding.pdf
      6. Spend profile required to carry complete Step V according to Plan A: attachment:Figure-5-Advanced-UK-US_Finance.pdf
      7. Spend profile required to carry complete Step V according to Plan B: attachment:Figure-6-Flat_UK-Flat_US-UK-US_Finance.pdf
    • Tables:
      1. Interface points identified in the MICE baseline-schedule analysis: attachment:Table-1-Delivered_Required_Dates.pdf
      2. Step IV baseline critical path: attachment:Table-2-Step_IV_Critical-Imminent-Near.pdf
      3. The tasks which lie on the Step~V baseline critical path for Plan A: attachment:Table-3-StepV_Critical_Near_Advanced.pdf
      4. The tasks which lie on the Step~V baseline critical path for Plan B: attachment:Table-4-StepV_Critical_Near_Flat.pdf
      5. The UK requirement for the completion of Step V according to Plan A: attachment:Table-5-UK-Advanced_Spend_profile.pdf
      6. The UK requirement for the completion of Step V according to Plan B: attachment:Table-6-UK-Flat_funded_Spend_profile.pdf
      7. The UK requirement for the completion of MICE at Step IV: attachment:Table-7-UK-Stop_Step_IV_Spend_profile.pdf
      8. Top level risks for the sub-projects for which the UK is responsible: attachment:Table-8-STFC-RiskRegisterAug.pdf
      9. Top level risks for the sub-projects for which the US is responsible: attachment:Table-9-MAP-RiskRegister.pdf
      10. Risk history for US risks: attachment:Table-10-US-risk_history.pdf
  2. Response to feedback from the RLSR panel and MPB
  3. DRAFT: MICE Project Assumptions Document: attachment:Assumptions-doc.pdf
    • To do:
      1. KL/RP: make final update for this issue on Monday 04Aug14.
  4. DRAFT: Planning the MICE Step IV Data Campaign: attachment:DataPlan.pdf
    • To do:
      1. SB/VB: make final update for on Monday 04Aug14.
  5. DRAFT: MICE Step IV magnet and beamline commissioning plan: attachment:Magnet_and_Beam_Commissioning.pdf
    • To do:
      1. JPa/KL: make final update for on Monday 04Aug14.
  6. DRAFT: MICE Step IV instrumentation commissioning plan: attachment:InstrPlan.pdf
    • To do:
      1. PS: make final update for on Monday 04Aug14.