DOE Reviews¶
DOE review of MAP and MICE, Brookhaven National Laboratory, 12th to 14th August 2014¶
Presentations:¶
- K. Long: MICE and its global context; 01-2014-08-12-LONG.pptx
- R. Preece: MICE-UK plan; 02-MICE-UK_Plan_120814.ppt
- A. Bross: MICe-US construction effort; 03-DOE_Review_MICE_construction_v11.pptx
- P. Garbincius: MICE-US resource-loaded schedule and budget profile; 04-PHG_MICE.pptx
- D. Kaplan: MICE-US experimental contributions; 05-Kaplan-MICE_MAP-DOE-Review-Aug2014-R11.pptx
Documents:¶
- Delivering the MICE project; options for success
- Figures:
- Top: Drawing of a single lattice cell of the Feasibility II cooling channel: Figure-1a-StudyII.pdf. Bottom: Rendered engineering drawing of MICE in the Step VI configuration: Figure-1b-StepVI.pdf
- Steps in the staged implementation of MICE: Figure-2-MICE-steps.pdf
- Step IV Dashboard: Figure-3-MICE_Dashboard.pdf
- Step IV baseline schedule milestones: Figure-4-Step_IV_milestones_Waterfall.pdf
- Step V critical path relating to Plan A: Figure-5-StepV_Critical_Path_Advanced.pdf
- Step V critical path relating to Plan B: Figure-6-StepV_Critical_Path_Flat_Funding.pdf
- Spend profile required to carry complete Step V according to Plan A: Figure-7-Advanced-UK-US_Finance.pdf
- Spend profile required to carry complete Step V according to Plan B: Figure-8-Flat_UK-Flat_US-UK-US_Finance.pdf
- Comparison of the UK spend profiles required to deliver Step V according to Plans A and B compared with the profile required to deliver Step IV: Figure-9-MICE-UK_Funding_Profiles.pdf
- Comparison of the US spend profiles required to deliver the components of Step V for which the US is responsible: Figure-10-MICE-US_Funding_Profiles.pdf
- Tables:
- Headlines of the minimal physics programme by Step in the staged implementation of the MICE programme: Table-1-PhysicsHeadlines.pdf
- Interface points identified in the MICE baseline-schedule analysis: Table-2-Delivered_Required_Dates.pdf
- Step IV baseline critical path: Table-3-Step_IV_Critical-Imminent-Near.pdf
- The tasks which lie on the Step~V baseline critical path for Plan A: Table-4-StepV_Critical_Near_Advanced.pdf
- The tasks which lie on the Step~V baseline critical path for Plan B: Table-5-StepV_Critical_Near_Flat.pdf
- The UK requirement for the completion of Step V according to Plan A: Table-6-UK-Advanced_Spend_profile.pdf
- The UK requirement for the completion of Step V according to Plan B: Table-7-UK-Flat_funded_Spend_profile.pdf
- The UK requirement for the completion of MICE at Step IV: Table-8-UK-Stop_Step_IV_Spend_profile.pdf
- Top level risks for the sub-projects for which the UK is responsible: Table-9-STFC-RiskRegisterAug.pdf
- Top level risks for the sub-projects for which the US is responsible: Table-10-MAP-RiskRegister.pdf
- Risk history for US risks: Table-11-US-risk_history.pdf
- Figures:
- Response to feedback from the RLSR panel and MPB
- MICE Project Assumptions Document
- Planning the MICE Step IV Data Campaign
- Magnet and Beam Commissioning at Step IV