SSU Soak test Fri 11th Sep¶
- SSU will run at full current for ~ 24 hours on Friday
- Plan is to:
- Set up, reference run (2 hours)
- Tracker timing (2 hours)
- SSU alignment (8 hours, 3 mm 200 Mev/c beamline)
- Beamline matching studies
- Run 6 mm, 10 mm 200 MeV/c beamlines, 1 hour each (3 hours)
- 140, 240 MeV/c beamlines
- More SSU alignment
- 240, 140 MeV/c beamline