Physics Shift Report¶
Start Date: 13th December
End Date: 16th December
Start Run: 08859
End Run:
Physics shifter: Francois Drielsma(13-14), Ao Liu(15-16)
Task¶
The task at end is to continue to take data for the emittance reduction measurement with LiH, task H11, for 240 MeV/c beams.
The cooling channel is in the setting 2016-04_2.4a
Task | Momentum | # Triggers | Beamline Tag | CoolingChannel Tag | Similar runs | Final Event Tally (k) |
H11a | 240 | 2e6 TOF1 | 2016-04-2.4a | |||
H11b | 240 | 2e6 TOF1 | 6-240+M3-Test1 | 2016-04-2.4a | ||
H11b | 240 | 2e6 TOF1 | 2016-04-2.4a |
Task H12 - Magnet alignment¶
Task | Momentum | # Triggers | Beamline Tag | CoolingChannel Tag | Similar runs | Final Event Tally (k) |
H12a | 140 | 8e5 TOF1 | 2016-04-2.4a | |||
H12b | 170 | 8e5 TOF1 | 2016-04-2.4a | |||
H12c | 240 | 8e5 TOF1 | 2016-04-2.4a |
Analysis¶
- Tag is the beamline tag
- Runs is a list of runs considered to make following calculations (I didn't use all runs for a particular tag)
- TOF1 Triggers is the sum of the CDB TOF1 triggers scalar; note this is trigger requests (does not include dead time/etc)
- TOF2 Triggers is the sum of the CDB TOF2 triggers scalar; note this is trigger requests (does not include coincidence with TOF1/etc)
- lmc1234 sum is the sum of the CDB luminosity monitor scalar
- time taken is the sum of the times listed (time between "start run" and "stop run")
- number in muon peak is the number reporting tof01 in the muon peak, tuned by tag (roughly 28 to 32 ns)
- number at tof2 is the number reporting at least one space point in tof1 and exactly one space point in tof2
- number passing all cuts is the number passing:-
- exactly one track in TKU
- tof01 in the muon peak (tuned by tag)
- TKU total momentum between 135 and 145 MeV/c
- Exactly one space point in TOF0 and TOF1
- number passing all cuts/p in tku:- I histogram p in TKU, then find the peak bin, then report number in the peak bin divide bin width
- number passing all cuts/tof01:- as per previous entry, but this time using tof01 histogram
Analyses: Task H11 - Emittance Reduction!!¶
Observations made on setting H11b:- Well matched with the expected peak momentum ~238.5 MeV/c, the presence of Iris 4 has been taken care off.
- A processing with momentum between [230-250] has been produced to study the emittance of the input beam.
- The upstream emittance is measured upstream as being ~6.5 mm
Tag | Runs | lmc1234 sum | TOF1 Triggers | TOF2 Triggers | time taken | number in muon peak | number at tof2 | number passing all cuts | number passing all cuts / p in tku [MeV/c^-1] | number passing all cuts / tof01 [ns^-1] |
6-240-diff8+M3-Test1_8873_8878 | [8873, 8874, 8875, 8877, 8878] | 2093453 | 2878659 | 1582708 | 6 hrs 19 mins | 785505 | 830762 | 210698 | 13569.66 | 520690.0 |
Sample output¶
Task H11 - Emittance Reduction!!¶
===== 6 mm-240 =====