Project

General

Profile

PC-2015-09-24 » History » Version 4

Rogers, Chris, 23 September 2015 17:15

1 3 Rogers, Chris
h2. Phone Details
2
3
http://mice.iit.edu/phonebridge.html
4
5
h2. Actions
6
7
* ACTION  *(Pasternak)*: determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS(!)? Run everything through OPERA?
8
* ACTION *(Drielsma/Rogers)*: EMR is misaligned by 10 cm; what is the implication for cooling channel acceptance
9
* ACTION *(Rogers)*: Optics without M1 at SSD
10
11
h2. RLSR/MPB Actions
12
13
* ACTION *Rogers*: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
14
* ACTION *Rogers*: Carry out an independent review of the beam dynamics analysis
15
16
h2. Agenda
17
18
* Actions
19
* Issues Arising
20
** Magnet commissioning - issues
21
* [[Physics shifts]]
22
* Field Mapping (*Victoria Blackmore*)
23
* Step IV Technical Paper
24
** MICE Muon Beamline (*Victoria Blackmore*, *Jaroslaw Pasternak*)
25
** Detectors (*Melissa Uchida*)
26
*** Alignment Measurement
27
*** Efficiency
28
*** Residuals
29
** Particle ID (*Celeste Pidcott*)
30
** Measurement of magnetic alignment (*Chris Rogers*)
31
** Quality of transported beam (*Chris Hunt*)
32
* Step IV First Demonstration of Cooling (*Chris Rogers*)
33
* Step I Papers (*Victoria Blackmore*)
34
** EMR paper
35
** Pion contamination
36
* MICE Demonstration of Ionisation Cooling (*Jaroslaw Pasternak*)
37
* Magnetics
38
** Non-linear beam optics/measurement(*Rob Ryne*)
39
* Absorber and material physics
40
** Scattering measurement (*Celeste/John N*)
41
** Energy loss measurement (*Rhys/Dimtrije*)
42
** Beam (de)polarisation
43
* Support
44
** Batch Production (*Ryan Bayes*)
45
** X-BOA (*Chris Rogers*)
46
** Online Analysis Tool (*Chris Rogers*)
47
** Trigger analysis (*Chris Rogers*)
48
* Date of next meeting
49
** September 17th
50
** September 24th
51
** October 1st