Project

General

Profile

PC-2015-09-24 » History » Revision 3

Revision 2 (Rogers, Chris, 23 September 2015 17:14) → Revision 3/6 (Rogers, Chris, 23 September 2015 17:15)

h2. Phone Details 

 http://mice.iit.edu/phonebridge.html 

 h2. Actions 

 * ACTION    *(Pasternak)*: determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS(!)? Run everything through OPERA? 
 * ACTION *(Drielsma/Rogers)*: EMR is misaligned by 10 cm; what is the implication for cooling channel acceptance 
 * ACTION *(Rogers)*: Optics without M1 at SSD 

 h2. RLSR/MPB Actions 

 * ACTION *Rogers*: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances. 
 * ACTION *Rogers*: Carry out an independent review of the beam dynamics analysis 

 h2. Agenda 

 * [[PC-2015-09-17a|Diagnostics]]  
 * Actions 
 * Issues Arising 
 ** Magnet commissioning - issues 
 * [[Physics shifts]] 
 * Field Mapping (*Victoria Blackmore*) 
 * Step IV Technical Paper 
 ** MICE Muon Beamline (*Victoria Blackmore*, *Jaroslaw Pasternak*) 
 ** Detectors (*Melissa Uchida*) 
 *** Alignment Measurement 
 *** Efficiency 
 *** Residuals 
 ** Particle ID (*Celeste Pidcott*) 
 ** Measurement of magnetic alignment (*Chris Rogers*) 
 ** Quality of transported beam (*Chris Hunt*) 
 * Step IV First Demonstration of Cooling (*Chris Rogers*) 
 * Step I Papers (*Victoria Blackmore*) 
 ** EMR paper 
 ** Pion contamination 
 * MICE Demonstration of Ionisation Cooling (*Jaroslaw Pasternak*) 
 * Magnetics 
 ** Non-linear beam optics/measurement(*Rob Ryne*) 
 * Absorber and material physics 
 ** Scattering measurement (*Celeste/John N*) 
 ** Energy loss measurement (*Rhys/Dimtrije*) 
 ** Beam (de)polarisation 
 * Support 
 ** Batch Production (*Ryan Bayes*) 
 ** X-BOA (*Chris Rogers*) 
 ** Online Analysis Tool (*Chris Rogers*) 
 ** Trigger analysis (*Chris Rogers*) 
 * Date of next meeting 
 ** September 17th 
 ** September 24th 
 ** October 1st