Project

General

Profile

PC-2015-09-24 » History » Version 3

Rogers, Chris, 23 September 2015 17:15

1 3 Rogers, Chris
h2. Phone Details
2
3
http://mice.iit.edu/phonebridge.html
4
5
h2. Actions
6
7
* ACTION  *(Pasternak)*: determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS(!)? Run everything through OPERA?
8
* ACTION *(Drielsma/Rogers)*: EMR is misaligned by 10 cm; what is the implication for cooling channel acceptance
9
* ACTION *(Rogers)*: Optics without M1 at SSD
10
11
h2. RLSR/MPB Actions
12
13
* ACTION *Rogers*: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
14
* ACTION *Rogers*: Carry out an independent review of the beam dynamics analysis
15
16
h2. Agenda
17
18
* [[PC-2015-09-17a|Diagnostics]] 
19
* Actions
20
* Issues Arising
21
** Magnet commissioning - issues
22
* [[Physics shifts]]
23
* Field Mapping (*Victoria Blackmore*)
24
* Step IV Technical Paper
25
** MICE Muon Beamline (*Victoria Blackmore*, *Jaroslaw Pasternak*)
26
** Detectors (*Melissa Uchida*)
27
*** Alignment Measurement
28
*** Efficiency
29
*** Residuals
30
** Particle ID (*Celeste Pidcott*)
31
** Measurement of magnetic alignment (*Chris Rogers*)
32
** Quality of transported beam (*Chris Hunt*)
33
* Step IV First Demonstration of Cooling (*Chris Rogers*)
34
* Step I Papers (*Victoria Blackmore*)
35
** EMR paper
36
** Pion contamination
37
* MICE Demonstration of Ionisation Cooling (*Jaroslaw Pasternak*)
38
* Magnetics
39
** Non-linear beam optics/measurement(*Rob Ryne*)
40
* Absorber and material physics
41
** Scattering measurement (*Celeste/John N*)
42
** Energy loss measurement (*Rhys/Dimtrije*)
43
** Beam (de)polarisation
44
* Support
45
** Batch Production (*Ryan Bayes*)
46
** X-BOA (*Chris Rogers*)
47
** Online Analysis Tool (*Chris Rogers*)
48
** Trigger analysis (*Chris Rogers*)
49
* Date of next meeting
50
** September 17th
51
** September 24th
52
** October 1st