Project

General

Profile

Actions

PC-2015-09-10

Phone Details

http://mice.iit.edu/phonebridge.html

Actions

  • ACTION (Pasternak): determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS? Run everything through OPERA?
  • ACTION (Rogers): Tolerances - controls people ask what are the tolerances on magnet current
  • ACTION (Drielsma/Rogers): EMR is misaligned by 10 cm; what is the implication for cooling channel acceptance
  • ACTION (Rogers): Effect of addition of Aluminium windows to the MICE Demo geometry
    • Jaroslaw did a study previously

RLSR/MPB Actions

  • ACTION Rogers: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
  • ACTION Rogers: Carry out an independent review of the beam dynamics analysis

Agenda

  • Actions
  • Issues Arising
  • Physics shifts - volunteers needed!
  • Field Mapping (Victoria Blackmore)
  • Step IV Technical Paper
    • MICE Muon Beamline (Victoria Blackmore, Jaroslaw Pasternak)
    • Detectors (Melissa Uchida)
      • Alignment Measurement
      • Efficiency
      • Residuals
    • Particle ID (Celeste Pidcott)
    • Measurement of magnetic alignment (Chris Rogers)
    • Quality of transported beam (Chris Hunt)
  • Step IV First Demonstration of Cooling (Chris Rogers)
  • Step I Papers (Victoria Blackmore)
    • EMR paper
    • Pion contamination
  • MICE Demonstration of Ionisation Cooling (Jaroslaw Pasternak)
  • Magnetics
    • Non-linear beam optics/measurement(Rob Ryne)
  • Absorber and material physics
    • Scattering measurement (Celeste/John N)
    • Energy loss measurement (Rhys/Dimtrije)
    • Beam (de)polarisation
  • Support
    • Batch Production (Ryan Bayes)
    • X-BOA (Chris Rogers)
    • Online Analysis Tool (Chris Rogers)
    • Trigger analysis (Chris Rogers)
  • Date of next meeting
    • September 17th
    • September 24th
    • October 1st

Notes

Chris Rogers
Ryan Bayes
Paul Kyberd
Tanaz Mohayai
Scott Wilbur
Adam Dobbs

General agreement that outline run plan is sensible for Friday
Tracker group will make tracker shifter, may go in with physics shifter
Tracker alignment/rotation is ongoing
  • No update or decision
    Discussed simulation issues
  • Noted CDB workaround to deal with no currents in CDB
  • Suggest running single "200 MeV/c" particle down the beamline axis is sensible
    Issue in tracker DAQ!!
  • Noted that this is a thing
  • Introduces significant systematic bias in all current data taking

Updated by Rogers, Chris over 7 years ago ยท 6 revisions