Project

General

Profile

Actions

PC-2015-09-03a

Can we do an update on the alignment/etc analysis at 14:00 on Thursday 3rd September, in the POD or on:

http://mice.iit.edu/phonebridge.html

  • Tracker-to-tracker alignment - Melissa/Chris Hunt
  • Tracker alignment to field - Chris Rogers
  • Cut-based beam selection vs 2015/01 data - Tanaz/Scott Wilbur
  • Full PID vs 2015/01 data - Celeste
  • PID detector alignment - Francois

Note I have a talk in VC - I have stolen some plots to show there; will try to distribute my slides before the meeting to give folks a chance to comment...

Cheers,
Chris

Notes

Celeste
Tanaz
Scott W
Durga
Francois

EMR data
  • all the files were processed with incorrect time window so poor efficiency in EMR
  • need a new iteration on batch production
  • time window in EMR should be cdb parameter
    Tanaz will wait for newly processed data
  • Durga to coordinate laptop processing for Tanaz; awaiting new batch production
TOF01 vs TOF12
  • Look muonic in Ckov
  • No cut on number of space points in TOF0
  • Using D2 current to make a TOF01 cut
Celeste
  • Still waiting for tracker rotation to be resolved
Francois
  • Study has been extended
  • No significant change from last time
  • Needs tracker to get better handle on upstream/downstream

Updated by Rogers, Chris about 8 years ago · 3 revisions