Project

General

Profile

PC-2015-05-14 » History » Version 1

Rogers, Chris, 05 May 2015 17:01

1 1 Rogers, Chris
h1. Phone Call 2015-05-14
2
3
Analysis phone call, 15:00 BST, Thursday 14th May 2015, RAL Conference Room CR10.
4
5
h2. Phone Details
6
7
http://mice.iit.edu/phonebridge.html
8
9
h2. Actions
10
11
* ACTION  *(Pasternak/Rogers)*: determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS(!)? Run everything through OPERA?
12
* ACTION *(Rogers)*: Tolerances - controls people ask what are the tolerances on magnet current
13
14
h2. RLSR/MPB Actions
15
16
* ACTION *Rogers*: Review the requirements for accurate end-to-end simulation
17
* ACTION *Rogers*: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
18
* ACTION *Rogers*: Carry out an independent review of the beam dynamics analysis
19
* ACTION *Rogers*: Define strategies to provide online feedback, quickly
20
21
h2. Actions following Run planning meeting
22
23
* ACTION *(Nugent)*: Estimate data rate with cooling channel magnets off
24
** Still waiting on good April data - this weekend?
25
26
h2. Agenda
27
28
* Actions
29
* Issues Arising
30
* [[Physics shifts]] - volunteers needed!
31
* Field Mapping (*Victoria Blackmore*)
32
** attachment:tracking_measured_misalignments.pdf - Chris Rogers
33
* Step IV Technical Paper
34
** MICE Muon Beamline (*Jaroslaw Pasternak*)
35
** Detectors (*Melissa Uchida*)
36
*** Alignment Measurement
37
*** Efficiency
38
*** Residuals
39
** Particle ID (*Celeste Pidcott*)
40
** Measurement of magnetic alignment (*Chris Rogers*)
41
** Quality of transported beam (*Chris Hunt*)
42
* Step IV First Demonstration of Cooling (*Chris Rogers*)
43
* Step I Papers (*Victoria Blackmore*)
44
** EMR paper
45
** Pion contamination
46
* MICE Demonstration of Ionisation Cooling (*Jaroslaw Pasternak*)
47
** Lattice close out by CM41; paper first revision soon afterwards
48
* Magnetics
49
** Non-linear beam optics/measurement(*Rob Ryne*)
50
* Absorber and material physics
51
** Scattering measurement
52
** Energy loss measurement
53
** Beam (de)polarisation attachment:analysismeeting300415.pdf
54
* Support
55
** Batch Production (*Ryan Bayes*)
56
** X-BOA (*Chris Rogers*)
57
** Online Analysis Tool (*Chris Rogers*)
58
** Trigger analysis (*Chris Rogers*)
59
* Date of next meeting
60
** April 30th
61
** (May 6th, VC)
62
** May 14th
63
** May 21st - clash with MAP workshop
64
** May 28th
65
** June 4th
66
** June 11th
67
** (CM 42: June 22-24) - we may want to have an analysis workshop around the CM