Project

General

Profile

Actions

Phone Call 2015-05-14

Analysis phone call, 15:00 BST, Thursday 14th May 2015, RAL Conference Room CR10.

Phone Details

http://mice.iit.edu/phonebridge.html

Actions

  • ACTION (Pasternak/Rogers): determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS? Run everything through OPERA?
  • ACTION (Rogers): Tolerances - controls people ask what are the tolerances on magnet current

RLSR/MPB Actions

  • ACTION Rogers: Review the requirements for accurate end-to-end simulation
  • ACTION Rogers: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
  • ACTION Rogers: Carry out an independent review of the beam dynamics analysis
    • Optics review - cover the entire analysis
  • ACTION Rogers: Define strategies to provide online feedback, quickly

Agenda

  • Actions
  • Issues Arising
  • Physics shifts - volunteers needed!
  • Field Mapping (Victoria Blackmore)
  • Step IV Technical Paper
    • MICE Muon Beamline (Jaroslaw Pasternak)
    • Detectors (Melissa Uchida)
      • Alignment Measurement
      • Efficiency
      • Residuals
    • Particle ID (Celeste Pidcott)
    • Measurement of magnetic alignment (Chris Rogers)
    • Quality of transported beam (Chris Hunt)
  • Step IV First Demonstration of Cooling (Chris Rogers)
  • Step I Papers (Victoria Blackmore)
    • EMR paper
    • Pion contamination
  • MICE Demonstration of Ionisation Cooling (Jaroslaw Pasternak)
    • Lattice close out by CM41; paper first revision soon afterwards
  • Magnetics
    • Non-linear beam optics/measurement(Rob Ryne)
  • Absorber and material physics
    • Scattering measurement
    • Energy loss measurement
    • Beam (de)polarisation attachment:analysismeeting300415.pdf
  • Support
    • Batch Production (Ryan Bayes)
    • X-BOA (Chris Rogers)
    • Online Analysis Tool (Chris Rogers)
    • Trigger analysis (Chris Rogers)
  • Date of next meeting
    • April 30th
    • (May 6th, VC)
    • May 14th
    • May 21st - clash with MAP workshop
    • May 28th
    • (June 4th, VC)
    • June 11th
    • June 18th
    • (CM 42: June 22-24) - we may want to have an analysis workshop around the CM

Updated by Rogers, Chris over 8 years ago ยท 12 revisions