Phone Call 2015-04-30¶
Analysis phone call, 15:00 BST, Thursday 30th April 2015, RAL Conference Room CR10.
Phone Details¶
http://mice.iit.edu/phonebridge.html
Actions¶
- ACTION (Pasternak/Rogers): determine magnetic settings routine - do we imagine "equivalent coil"? Implement iron in MAUS? Run everything through OPERA?
- ACTION (Rogers): Tolerances - controls people ask what are the tolerances on magnet current
RLSR/MPB Actions¶
- ACTION Rogers: Review the requirements for accurate end-to-end simulation
- ACTION Rogers: Report, in a MICE note to the collaboration, the definitions and methods used for the determination of the betatron functions and emittances.
- ACTION Rogers: Carry out an independent review of the beam dynamics analysis
- ACTION Rogers: Define strategies to provide online feedback, quickly
Actions following Run planning meeting¶
- ACTION (Nugent): Estimate data rate with cooling channel magnets off
- Still waiting on good April data - this weekend?
Agenda¶
- Actions
- Issues Arising
- Physics shifts - volunteers needed!
- Field Mapping (Victoria Blackmore)
- tracking_measured_misalignments.pdf - Chris Rogers
- Step IV Technical Paper
- MICE Muon Beamline (Jaroslaw Pasternak)
- Detectors (Melissa Uchida)
- Alignment Measurement
- Efficiency
- Residuals
- Particle ID (Celeste Pidcott)
- Measurement of magnetic alignment (Chris Rogers)
- Quality of transported beam (Chris Hunt)
- Step IV First Demonstration of Cooling (Chris Rogers)
- Step I Papers (Victoria Blackmore)
- EMR paper
- Pion contamination
- MICE Demonstration of Ionisation Cooling (Jaroslaw Pasternak)
- Lattice close out by CM41; paper first revision soon afterwards
- Magnetics
- Non-linear beam optics/measurement(Rob Ryne)
- Absorber and material physics
- Scattering measurement
- Energy loss measurement
- Beam (de)polarisation analysismeeting300415.pdf
- Support
- Batch Production (Ryan Bayes)
- X-BOA (Chris Rogers)
- Online Analysis Tool (Chris Rogers)
- Trigger analysis (Chris Rogers)
- Date of next meeting
- April 30th
- (May 6th, VC)
- May 14th
- May 21st - clash with MAP workshop
- May 28th
- June 4th
- June 11th
- (CM 42: June 22-24) - we may want to have an analysis workshop around the CM
Notes¶
Present¶
Rob Ryne
Holge Witte
Jaroslaw Pasternak
John Nugent
Joe
Adam Dobbs
Field Off Trigger Rate¶
- Solenoid fields off triggers at TOF1 44000 TOF2 1000
- Solenoid fields on triggers at TOF1 53000 TOF2 43000
- => 3 % rate scaling; but run with TOF2 trigger; so limit comes from ISIS/target
- 120 triggers per spill with the Decay Solenoid at TOF1, not including tracker deadtime
- Jaroslaw notes attempt to optimise was not successful
Physics shifter¶
- Seek to get the physics devil automated
Beamline¶
- Validated calibration
- Checked some old settings
- Made two additional settings to match to diffuser
- Made two additional settings to optimise for "straight tracks"
- Seeking to validate MC
EMR Papers¶
- Review next week (Tuesday)
Pion contamination¶
- See slides
- Feldman-Cousins?
- Frequentist method based on likelihood ratio; can deal in an automatic way with statistical results that fall outside of physically allowed; determines upper limit or two sided;
- Paul Soler suggests alternatively use Bayesian method (e.g. Higgs papers)
MDIC¶
- Final coil positions by MAP meeting
- Use IPAC paper as starting point for PR-ST AB paper
Error Fields¶
- Slide 4: cusps come from the mesh
- Slide 4: symmetry point is at -2.75; tracker is at around -4.75 to -5.75
- Few * 10^-4 T in the tracker azimuthal
- Slide 9: units are T at 0.15 m
Solenoid fields in 2 weeks time
Non-linear beam optics¶
- Looking at the 6x6 problem...
Updated by Rogers, Chris over 8 years ago ยท 16 revisions