Actions
Demonstration of Ionisation Cooling¶
Run Plan¶
Beam rate:-
- Spill is 1 ms not 2 ms as per Step IV - data rate r -> r_{iv}*0.7
- We can cope with 10% RMS of the 5 ns RF period data rate r -> r_{iv}*0.1
Expect data rate is 0.07 during physics measurements
Physics Grid looks like: *
1. No beam - full physics grid; data rate = r_{iv}
2. Reduced RF, systematics measurement, 2e6 muons; data rate = r_{iv}
3. Full RF, RF shielding in, no central absorber, systematics measurement, 2e6 muons; data rate = r_{iv}
4. Full RF, RF shielding in, central absorber in, physics measurement, full physics grid; data rate = 0.07 r_{iv}
Updated by Rogers, Chris over 8 years ago ยท 2 revisions