Rogers, Chris, 26 June 2018 11:48

1 3 Rogers, Chris
h1. Analysis Working Party
2 1 Franchini, Paolo
3 10 Rogers, Chris
Start time is 9 am on Monday 25th June, 10 am on Tuesday 26th. The room will not be locked overnight so feel free to come in earlier (and/or stay later).
4 2 Rogers, Chris
5 7 Rogers, Chris
We will be in CR13, near the South car park. There is a map here: attachment:RALSitePlan.pdf
6 6 Rogers, Chris
7 1 Franchini, Paolo
h2. System performance paper: Monday morning
8 4 Rogers, Chris
9
[[System-performance-paper_2018-06-25|System performance paper meeting page]]
10 9 Rogers, Chris
11
h2. Scattering - referees: Monday afternoon
12 11 Hunt, Christopher
13 21 Rogers, Chris
h2. Long Emittance Paper: Tuesday Morning
14 11 Hunt, Christopher
15 21 Rogers, Chris
h3. Monday
16 1 Franchini, Paolo
17 21 Rogers, Chris
18
Long emittance paper
19
20 11 Hunt, Christopher
* Convergence of the MC simulation Model
21 14 Rogers, Chris
** Dipoole model implemented; target model not implemented but doesn't appear to be sensitive
22
** Tracker model believe implemented
23
*** Plan to measure density and geometry by <someone>
24
*** Plan to look at chi2 of straight tracks
25 12 Hunt, Christopher
* Plan for the integration of field models into systematics studies
26 18 Rogers, Chris
** Asked Joe L to upload the field map files; Paul J looking into comparing with MAUS models
27 11 Hunt, Christopher
* Performance of track fit and possible future upgrades
28 17 Rogers, Chris
** Discussed issues to do with track fitting and low pt tracks; comments from Francois by email
29 15 Rogers, Chris
** Chris H reviewed tracker tof refit routines and Chris R agreed to have a go at running them
30 16 Rogers, Chris
** Chris H has done some track fitting using non-uniform fitter; it might work
31 13 Hunt, Christopher
* Standardize the datasets and some cuts
32 17 Rogers, Chris
** Discussed using all (within reason) data
33
** Discussed presentation of results
34
*** Propose sum all beam line settings for a CC magnet configuration; select subsamples for analysis
35
*** Selected configurations comparison of emittance change vs input emittance
36 1 Franchini, Paolo
*** Comparison of equilibrium emittance vs CC magnet configuration
37
*** Parameterisation of amplitude change to exclude aberrations and emittance growth; comparison vs CC magnet configurations
38 21 Rogers, Chris
39
40
41 19 Rogers, Chris
42
h3. Tuesday
43
44
Target discussion
45
* Discussed plans for the target model
46 20 Rogers, Chris
47 19 Rogers, Chris
Some diffuser discussion
48
* Looked at high radius issue for 10 mm beam
49
* Discussed modified geometry model as implemented by Durga/Rogers
50 20 Rogers, Chris
51 19 Rogers, Chris
Some tracker discussion
52
* Discussed chi2 issue
53
* Discussed MC dead channels issue
54
* Chris H promises to deliver plot for system performance paper
55 20 Rogers, Chris
56 19 Rogers, Chris
Energy loss analysis
57
* Working through systematic uncertainties
58 22 Rogers, Chris
59
!2017-02-7_runs.png!