Actions
2018-06-25 analysis-working-party » History » Revision 18
« Previous |
Revision 18/22
(diff)
| Next »
Rogers, Chris, 25 June 2018 15:18
Analysis Working Party¶
Start time is 9 am on Monday 25th June, 10 am on Tuesday 26th. The room will not be locked overnight so feel free to come in earlier (and/or stay later).
We will be in CR13, near the South car park. There is a map here: RALSitePlan.pdf
System performance paper: Monday morning¶
System performance paper meeting page
Scattering - referees: Monday afternoon¶
Long Emittance Paper: Tuesday Morning?¶
Discussion Objectives¶
- Convergence of the MC simulation Model
- Dipoole model implemented; target model not implemented but doesn't appear to be sensitive
- Tracker model believe implemented
- Plan to measure density and geometry by <someone>
- Plan to look at chi2 of straight tracks
- Plan for the integration of field models into systematics studies
- Asked Joe L to upload the field map files; Paul J looking into comparing with MAUS models
- Performance of track fit and possible future upgrades
- Discussed issues to do with track fitting and low pt tracks; comments from Francois by email
- Chris H reviewed tracker tof refit routines and Chris R agreed to have a go at running them
- Chris H has done some track fitting using non-uniform fitter; it might work
- Standardize the datasets and some cuts
- Discussed using all (within reason) data
- Discussed presentation of results
- Propose sum all beam line settings for a CC magnet configuration; select subsamples for analysis
- Selected configurations comparison of emittance change vs input emittance
- Comparison of equilibrium emittance vs CC magnet configuration
- Parameterisation of amplitude change to exclude aberrations and emittance growth; comparison vs CC magnet configurations
Updated by Rogers, Chris about 5 years ago · 18 revisions