Project

General

Profile

2018-05-09-system » History » Revision 28

Revision 27 (Franchini, Paolo, 09 May 2018 12:10) → Revision 28/49 (Franchini, Paolo, 09 May 2018 16:26)

h1. System performance paper meeting: 9/5/2018 - 11am 

 Phone details: 

 http://mice.iit.edu/phonebridge.html 

 h2. Agenda: 

 5 minutes for each contribution + 30 minutes for general discussion. 

 | *Main author(s)*               | *Contribution*       | *Material*| *Notes* | 
 ||||| 
 | Viktor, Scott                  | TOF                  |             |     attachment:tof_performance_section_outline.pdf        | 
 | ?                              | Ckov                 |             |           |    
 | Domizia, Ludovico, Mariyan     | KL                   | on GitHub | first draft ready | 
 | Francois                       | EMR                  |             |           | 
 | Melissa                        | Tracker              |             | agreed on 5 pages | 
 | Scott, Melissa                 | PID                  |             |           | 
 | Chris Rogers, Melissa          | Track matching       |             | attachment:System_Performance_Paper_Track_Matching.pdf    | 
 | Francois, Paul                 | Detector alignment |             | MICE note being reviewed    | 
 | Chris Hunt, Joe                | Magnets              |             || 
 | Tom, Paolo                     | Target model         |             | attachment:Target.pdf "MICE note":https://github.com/pfranchini/MICE-target-note in progress |  
 | Ajit, Scott                    | Absorber model       |             || 
 | Melissa                        | Diffuser study       |             | separate paper? | 

 h2. Details: 

 * Common data sample: 
 ** 2017/02 and 2017/03 runs 
 ** 2T and 3T in SSD 
 ** 140 - 240 MeV/c 
 ** 3, 6, 10 nominal beams 
 ** LiH, LH2, wedge 

 ** Official MC to be used 

 * GitHub: https://github.com/pfranchini/MICE-systems-performance-paper 

 * LaTex structure: https://github.com/pfranchini/MICE-systems-performance-paper/blob/master/Systems-performance.pdf 

 h2. Notes and AOB: 

 * Attendance 
 ** RAL: Chris R., Paolo 
 ** Phone: Paul S., Soler, Tom, Scott, Viktor, Francois, Mariyan, Domizia Francois 
 * Apologies: Ajit 

 --- 
 * TOF: agreed on the outline of the contribution. 3-4 pages. 

 * Ckov: photoelectron vs momentum curves to be reproduced. 

 * KL: first draft in place. To be refined/rebalanced once we have the other contributions. 

 * EMR: include low level efficiency and PID to reject positrons. 

 * Tracker: agreed on 5 pages 
 ** 1 page hardware 
 ** 2 pages low level recon 
 ** 2 track selection/kalman, noise, efficiency and resolution 
 A lot of analysis material is ready (and easily adapted from 7469). The noise analysis has never been formalised and may require few more time.  

 * PID: Scott has updated the software framework. 

 * Track matching: 

 * Absorber model: LH2 absorber validation stands. Waiting from Colin for measurements done for the safety case. 


 Agreed to show a first version of the plots during the imminent Warwick workshop. 

 --- 

 * Next meeting: Warwick workshop, Friday 15th May 1.00 pm 

 ---