2018-05-09-system » History » Revision 28
Revision 27 (Franchini, Paolo, 09 May 2018 12:10) → Revision 28/49 (Franchini, Paolo, 09 May 2018 16:26)
h1. System performance paper meeting: 9/5/2018 - 11am Phone details: http://mice.iit.edu/phonebridge.html h2. Agenda: 5 minutes for each contribution + 30 minutes for general discussion. | *Main author(s)* | *Contribution* | *Material*| *Notes* | ||||| | Viktor, Scott | TOF | | attachment:tof_performance_section_outline.pdf | | ? | Ckov | | | | Domizia, Ludovico, Mariyan | KL | on GitHub | first draft ready | | Francois | EMR | | | | Melissa | Tracker | | agreed on 5 pages | | Scott, Melissa | PID | | | | Chris Rogers, Melissa | Track matching | | attachment:System_Performance_Paper_Track_Matching.pdf | | Francois, Paul | Detector alignment | | MICE note being reviewed | | Chris Hunt, Joe | Magnets | || | Tom, Paolo | Target model | | attachment:Target.pdf "MICE note":https://github.com/pfranchini/MICE-target-note in progress | | Ajit, Scott | Absorber model | || | Melissa | Diffuser study | | separate paper? | h2. Details: * Common data sample: ** 2017/02 and 2017/03 runs ** 2T and 3T in SSD ** 140 - 240 MeV/c ** 3, 6, 10 nominal beams ** LiH, LH2, wedge ** Official MC to be used * GitHub: https://github.com/pfranchini/MICE-systems-performance-paper * LaTex structure: https://github.com/pfranchini/MICE-systems-performance-paper/blob/master/Systems-performance.pdf h2. Notes and AOB: * Attendance ** RAL: Chris R., Paolo ** Phone: Paul S., Soler, Tom, Scott, Viktor, Francois, Mariyan, Domizia Francois * Apologies: Ajit --- * TOF: agreed on the outline of the contribution. 3-4 pages. * Ckov: photoelectron vs momentum curves to be reproduced. * KL: first draft in place. To be refined/rebalanced once we have the other contributions. * EMR: include low level efficiency and PID to reject positrons. * Tracker: agreed on 5 pages ** 1 page hardware ** 2 pages low level recon ** 2 track selection/kalman, noise, efficiency and resolution A lot of analysis material is ready (and easily adapted from 7469). The noise analysis has never been formalised and may require few more time. * PID: Scott has updated the software framework. * Track matching: * Absorber model: LH2 absorber validation stands. Waiting from Colin for measurements done for the safety case. Agreed to show a first version of the plots during the imminent Warwick workshop. --- * Next meeting: Warwick workshop, Friday 15th May 1.00 pm ---