Project

General

Profile

Actions

2018-05-09-system » History » Revision 28

« Previous | Revision 28/49 (diff) | Next »
Franchini, Paolo, 09 May 2018 16:26


System performance paper meeting: 9/5/2018 - 11am

Phone details:

http://mice.iit.edu/phonebridge.html

Agenda:

5 minutes for each contribution + 30 minutes for general discussion.

Main author(s) Contribution Material Notes
Viktor, Scott TOF tof_performance_section_outline.pdf
? Ckov
Domizia, Ludovico, Mariyan KL on GitHub first draft ready
Francois EMR
Melissa Tracker agreed on 5 pages
Scott, Melissa PID
Chris Rogers, Melissa Track matching System_Performance_Paper_Track_Matching.pdf
Francois, Paul Detector alignment MICE note being reviewed
Chris Hunt, Joe Magnets
Tom, Paolo Target model Target.pdf MICE note in progress
Ajit, Scott Absorber model
Melissa Diffuser study separate paper?

Details:

  • Common data sample:
    • 2017/02 and 2017/03 runs
    • 2T and 3T in SSD
    • 140 - 240 MeV/c
    • 3, 6, 10 nominal beams
    • LiH, LH2, wedge
  • Official MC to be used

Notes and AOB:

  • Attendance
    • RAL: Chris R., Paolo
    • Phone: Paul S., Tom, Scott, Viktor, Francois, Mariyan, Domizia
  • Apologies: Ajit

  • TOF: agreed on the outline of the contribution. 3-4 pages.
  • Ckov: photoelectron vs momentum curves to be reproduced.
  • KL: first draft in place. To be refined/rebalanced once we have the other contributions.
  • EMR: include low level efficiency and PID to reject positrons.
  • Tracker: agreed on 5 pages
    • 1 page hardware
    • 2 pages low level recon
    • 2 track selection/kalman, noise, efficiency and resolution
      A lot of analysis material is ready (and easily adapted from 7469). The noise analysis has never been formalised and may require few more time.
  • PID: Scott has updated the software framework.
  • Track matching:
  • Absorber model: LH2 absorber validation stands. Waiting from Colin for measurements done for the safety case.

Agreed to show a first version of the plots during the imminent Warwick workshop.


  • Next meeting: Warwick workshop, Friday 15th May 1.00 pm

Updated by Franchini, Paolo over 5 years ago · 28 revisions