Project

General

Profile

Actions

2018-05-09-system » History » Revision 26

« Previous | Revision 26/49 (diff) | Next »
Lord, Tom, 09 May 2018 11:35


System performance paper meeting: 9/5/2018 - 11am

Phone details:

http://mice.iit.edu/phonebridge.html

Agenda:

5 minutes for each contribution + 30 minutes for general discussion.

Main author(s) Contribution Material Notes
Viktor, Scott TOF tof_performance_section_outline.pdf
? Ckov
Domizia, Ludovico, Mariyan KL on GitHub first draft ready
Francois EMR
Melissa Tracker agreed on 5 pages
Scott, Melissa PID
Chris Rogers, Melissa Track matching System_Performance_Paper_Track_Matching.pdf
Francois, Paul Detector alignment MICE note being reviewed
Chris Hunt, Joe Magnets
Tom, Paolo Target model Target.pdf MICE note in progress
Ajit, Scott Absorber model
Melissa Diffuser study separate paper?

Details:

  • Common data sample:
    • 2017/02 and 2017/03 runs
    • 2T and 3T in SSD
    • 140 - 240 MeV/c
    • 3, 6, 10 nominal beams
    • LiH, LH2, wedge
  • Official MC to be used

Notes and AOB:

  • Attendance
    • RAL: Chris R., Paolo
    • Phone: Paul Soler, Tom, Scott, Viktor, Francois
  • Apologies: Ajit

  • Tracker: agreed on 5 pages
    • 1 page hardware
    • 2 pages low level recon
    • 2 track selection/kalman, noise, efficiency and resolution
  • Absorber model: LH2 absorber validation stands. Waiting from Colin for measurements done for the safety case.

  • Next meeting: Warwick workshop, Friday 15th May 1.00 pm

Updated by Lord, Tom over 5 years ago · 26 revisions