2017-10-19 2017-10-23 physics-shifter » History » Version 9

Mohayai, Tanaz Angelina, 24 October 2017 05:08

1 1 Mohayai, Tanaz Angelina
Physics Shift Report
2
3
Start Date: 10-10-2017
4
End Date: 10-23-2017
5
Start Run: 10016
6 8 Mohayai, Tanaz Angelina
End Run: 10085
7 1 Mohayai, Tanaz Angelina
Physics shifter: Tanaz A. Mohayai
8
9
h2. Summary of Runs
10
11
| *Run Number*      | *Purpose*                                                                     |                               
12
| 10016        | Reference Run                                                     |
13
| 10017 - 10018       | Reference Run - Beam Bump Tuning |
14 6 Mohayai, Tanaz Angelina
| 10019 - 10054      | Empty LH2 - Flip Mode - 140MeV - 2T |
15
| 10055 - 10062      | Empty LH2 - Flip Mode - 140MeV - 2T |
16
| 10063 - 10077      | Empty LH2 - Flip Mode - 140MeV - 2T |
17 5 Mohayai, Tanaz Angelina
| 10078 - 10085      | Empty LH2 - Flip Mode - 170MeV - 3T |
18 2 Mohayai, Tanaz Angelina
19
h2. Elog, CDB, and Reconstruction
20
21
Elog entries are ok.
22
23
CDB uploaded ok with the exception of the following runs: 
24 3 Mohayai, Tanaz Angelina
10021: it has null End Date (as reported in the corresponding elog, Run Plan GUI hung up at end of run due to illegal character in end-run comment)
25 2 Mohayai, Tanaz Angelina
10021: Start comment is wrong and should be 4 mm (not 3 mm)
26 1 Mohayai, Tanaz Angelina
10022: Start comment is wrong and should be 4 mm (not 3 mm)
27 6 Mohayai, Tanaz Angelina
10083: not in the CDB but properly explained in the corresponding MICE log (an attempt to start a Reference run was made but was never properly recorded in CDB)
28 2 Mohayai, Tanaz Angelina
29 1 Mohayai, Tanaz Angelina
Online reconstruction is ok
30 6 Mohayai, Tanaz Angelina
All runs are reconstructing ok with the exception of the following: 
31
10083: was never recorded in CDB (please see above for explanation)
32
33
h3. Timing Study
34 7 Mohayai, Tanaz Angelina
35
There were tracker timing studies carried out during this physics shift period. The corresponding run numbers are in "Summary of Runs" table above.
36 9 Mohayai, Tanaz Angelina
It was concluded that the baseline time (the current time) setting for the H40a task in the current run plan (3-140+M3-Test3 beamline tag in **https://micewww.pp.rl.ac.uk/projects/operations/wiki/RunPlan20171015) is the optimum. This is because the "the maximum of the accepted trigger fraction is found at this baseline time". See the plot attached to elog entry: **https://micewww.pp.rl.ac.uk/elog/Shift+summary/429