Physics Shift Report

Start Date: 10-10-2017
End Date: 10-23-2017
Start Run: 10016
End Run: --
Physics shifter: Tanaz A. Mohayai

Summary of Runs

Run Number Purpose
10016 Reference Run
10017 - 10018 Reference Run - Beam Bump Tuning
10019 - 10077 Empty LH2 - Flip Mode - 140MeV - 2T
10078 - 10085 Empty LH2 - Flip Mode - 170MeV - 3T

Elog, CDB, and Reconstruction

Elog entries are ok.

CDB uploaded ok with the exception of the following runs:
10021: it has null End Date (as reported in the corresponding elog, Run Plan GUI hung up at end of run due to illegal character in end-run comment)
10021: Start comment is wrong and should be 4 mm (not 3 mm)
10022: Start comment is wrong and should be 4 mm (not 3 mm)

Online reconstruction is ok