 Going through table in 2015/01 v5 run plan... 

 h2. TOF Calibration 

 This is just a cut and paste from [[operations:RunPlan20150425]] 

 | Particle Species| p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1    | Q2    | Q3      | D1      | DS      | D2     | Q4       | Q5      | Q6      | Q7     | Q8       | Q9     | SSU E2 | SSU CC | SSU E1 | SSU M2 | SSU M1 | FC       | SSD M1 | SSD M2 | SSD E1 | SSD CC | SSD E2 | 
 |                   | MeV/c      | MeV/c| MeV/c| mm                | A     | A     | A       | A       | A       | A      | A        | A       | A       | A      |A         | A      | A        | A        | A        | A        | A        | A        | A        | A        | A        | A        | A        | 
 | Positron          | 300.0      | 259.7|249.58| 29                |66.29|82.54| 57.23 | 195.91| 426.03| 98.59| 163.16 |218.79 | 144.14| 83.40| 125.70 | 80.06| 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 0.       | 

 h2. Tracker Hardware commissioning 

 Upstream tracker; maximal fluence setting:- aim is to get as many particles as possible through the tracker centre, choose muons because they don't decay. No diffuser, low emittance beamline 

 Upstream tracker; maximal illumination setting:- aim is to illuminate the upstream tracker reasonably evenly, choose muons because they don't readily decay. High emittance beamline 

 Downstream tracker; maximal fluence setting:- we will illuminate the entire downstream tracker no matter what, so here we want to just get the best rate through that we possibly can 

 h2. Tracker Validation 

 Downstream tracker; maximal fluence setting:- aim is to illuminate both trackers with as many muons as possible 

 h2. Beamline Pre-Commissioning 

 To be defined. 