2015 01 Optics Settings

Going through table in 2015/01 v5 run plan...

TOF Calibration

This is just a cut and paste from RunPlan20150425

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# V MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
25000 2 Positron 300.0 259.7 249.58 29 66.29 82.54 57.23 195.91 426.03 98.59 163.16 218.79 144.14 83.40 125.70 80.06 1678 TOF+Calib300w/DS

Tracker Hardware commissioning

Updated by Rogers, Chris almost 9 years ago · 2 revisions