Project

General

Profile

PC220213 » 130222_GlobalReconScheduleDiscussion.txt

Taylor, Ian, 22 February 2013 15:06

 
1
A short list of rough tasks that I think need doing.  To be discussed
2
and expanded at the meeting. - Ian Taylor
3

    
4
Data Structure:
5

    
6
  - Completed / released next week.
7

    
8
    - Currently finalizing lcov and documentation coverage.
9

    
10
    - Need to look at Enums
11

    
12
Interface with detector groups:
13

    
14
  - Read in SpacePoints from all detector reconstructions.
15

    
16
  - Identify named contact for each detector group.
17

    
18
Tracker Track matching / extrapolation:
19

    
20
  - Tracker -> Tracker
21

    
22
  - Tracker -> Upstream (TOF, CKov)
23

    
24
  - Tracker -> Downstream (EMR, TOF, KL)
25

    
26
Track Fitting:
27

    
28
  - Discuss required level of accuracy for fit
29

    
30
    - Exact location / emittance only vital at certain points.
31

    
32
    - Kalman between trackers is vital (for some scenarios).
33

    
34
Hypothesis Construction:
35

    
36
  - Inflight decays
37

    
38
  - PID disagreement / combination
39

    
40
  - Pile-up
41

    
42
Analysis Interface:
43

    
44
  - Coordinate with analysis group
45

    
46
    - Confirm data structure changes (started at CM35).
47

    
48
    - List of access methods requested...
(1-1/2)