Runplan

  • Calibration *
  • Insert and reinsert fibres 100 times into middle 10/11 MPPCs to calibrate the effect of manually placing fibres.
  • Test MPPC backgrounds for variation with time and temperature.
  • Test MPPC with fibres attached.