Project

General

Profile

QPS 29/04/16

Agenda

  • Magnet system power supply handover
    • Conditions
      • Power supply stability tests
      • Interlock verifications
      • Sign-over procedure
    • Timetable.
    • Progress.
      • Resistors
      • Emergency stop buttons
  • QPS page on wiki
  • Magnet readiness review.
  • AOB

Documents

Phone Details

UK - 0844 473 7373
US - 1 415 363 0833
PIN 801140

11.00 UK R1 2nd floor East meeting room

2016-04-29QD-QP-Notes-CW.pdf (34.1 KB) Whyte, Colin, 29 April 2016 11:46