Project

General

Profile

Shifter Training Syllabus for the Proton Absorbers

  1. Checking the status: webcam, beamline summary, etc.
    Beamline Summary
  2. Starting the relevant control screen
    Proton Absorber Controls panel
  3. Manual operation
  4. Errors and emergency procedures

ProtonAbsorberControl.png - Proton Absorber Controls panel (13.1 KB) Nebrensky, Henry, 24 June 2015 21:59