Project

General

Profile

20160105 » History » Version 20

Boyd, Steven, 12 January 2016 15:25

1 14 Boyd, Steven
h1. Commissioning and Ops Scheduling meeting : 12/1/2016
2 1 Boyd, Steven
3 1 Boyd, Steven
To be held in CR10 in the ATLAS Building @ 15:30 pm 
4 1 Boyd, Steven
5 1 Boyd, Steven
Phone access :  ReadyTalk number 
6 1 Boyd, Steven
US 866-740-1260
7 1 Boyd, Steven
UK 0800-496-0576
8 1 Boyd, Steven
Swiss 0800-70-53-51
9 1 Boyd, Steven
Italy 800182592
10 1 Boyd, Steven
Access Code: 2155402
11 1 Boyd, Steven
12 1 Boyd, Steven
h2. Agenda:
13 1 Boyd, Steven
14 1 Boyd, Steven
* Review of tasks and activities identified at last meeting
15 16 Boyd, Steven
** Plans for realignment of SSD 
16 19 Boyd, Steven
*** Survey of TOF0
17 19 Boyd, Steven
*** Realignment of EMR
18 14 Boyd, Steven
** DC to contact Health Physics about calibration of neutron monitor whilst we have access
19 20 Boyd, Steven
** Simulation of effect of air in the drift space between tracker and absorber (John N)
20 5 Boyd, Steven
* Upcoming activities : chaired by DC
21 11 Boyd, Steven
** "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
22 17 Boyd, Steven
* Issues for discussion
23 17 Boyd, Steven
** Faulty water control replacement (John G)
24 18 Boyd, Steven
** Test of repair of upstream tracker leak - requires removal of US PRY (John G)
25 1 Boyd, Steven
* AOB
26 15 Boyd, Steven
* Date of next meeting : January 19th